Table (a = left/b = right)
F
zmax a
2000 N
M
ymax a
200 Nm
F
zmax b
2000 N
M
ymax b
200 Nm
Material tray level with steel swivel (a = left/b = right)
F
zmax a
1600 N
M
ymax a
60 Nm
F
zmax b
1600 N
M
ymax b
60 Nm
Material tray level with angle adjustment (a = left/b = right)
F
zmax a
2000 N
M
ymax a
100 Nm
F
zmax b
2000 N
M
ymax b
100 Nm
Mounting rail with steel swivel (a = left/b = right)
F
zmax a
1500 N
M
ymax a
20 Nm
F
zmax b
1500 N
M
ymax b
20 Nm
Table
Fig. 24: Table
Material tray level with steel swivel
Fig. 25: Material tray level with steel
swivel
Material tray level with angle
adjustment
Fig. 26: Material tray level with angle
adjustment
Mounting rail
Fig. 27: Mounting rail
Technical data
Load data
29.05.2019
Assembly workstation RK Easywork
102
Summary of Contents for RK Rose+Krieger Easywork
Page 55: ...Anhang Anhang 29 05 2019 Montagearbeitsplatz RK Easywork 55...
Page 56: ...Anhang 29 05 2019 Montagearbeitsplatz RK Easywork 56...
Page 58: ...Konformit tserkl rung 29 05 2019 Montagearbeitsplatz RK Easywork 58...
Page 110: ...Appendix Appendix 29 05 2019 Assembly workstation RK Easywork 110...
Page 112: ...Declaration of conformity 29 05 2019 Assembly workstation RK Easywork 112...