15
2
2
Installation and Patient Safety
N O T E
The M1013A IntelliVue G1 and the M1019A IntelliVue G5 must be installed by qualified personnel
capable of performing the post-installation checks as outlined in the Test and Inspection Matrix
This chapter describes how to install the Philips M1013A IntelliVue G1 and the M1019A IntelliVue
G5. It details the operating environment required by the gas analyzers as well as instructions on how to
physically connect them to the monitor and how to fit the gas exhaust return system. Next, the patient
safety information is detailed. Finally, this chapter describes the software setup required and any post-
installation checks that have to be performed before using the gas analyzer together with a reminder of
the preventive maintenance (PM) checks and their frequencies.
CAUTION
The gas analyzer must be positioned on a surface with a maximum incline of 15°. To avoid condensed
water collecting in the patient sample tube, it is recommended that the gas analyzer is positioned at or
above patient level, wherever possible.
Site Preparation - Introduction
This section describes the procedures you should follow to plan and prepare a site for an IntelliVue G1/
G5 installation.
Refer to the
Site Preparation
chapter in the respective IntelliVue Patient Monitor Service Guide, for
details about:
• Site planning.
• Roles and responsibilities for local and Philips personnel.
• Remote installation planning.
These details are also valid for the IntelliVue G1 / G5.
IntelliVue G1/G5 Site Requirements
For space requirements and environmental requirements refer to chapter 1,
Introduction
.