2-3-1
U29NMA_PC
MECHANICAL ALIGNMENT PROCEDURES
Explanation of alignment for the tape to correctly run
starts on the next page. Refer to the information below
on this page if a tape gets stuck, for example, in the
mechanism due to some electrical trouble of the unit.
Service Information
A.
Method for Manual Tape Loading/Unloading
To load a cassette tape manually:
1. Disconnect the AC plug.
2. Remove the Top Case and Front Assembly.
3. Insert a cassette tape. Though the tape will not be
automatically loaded, make sure that the cassette
tape is all the way in at the inlet of the Cassette
Holder. To confirm this, lightly push the cassette
tape further in and see if the tape comes back out,
by a spring motion, just as much as you have
pushed in.
4. Turn the LDG Belt in the appropriate direction
shown in Fig. M1 for a minute or two to complete
this task.
To unload a cassette tape manually:
1. Disconnect the AC plug.
2. Remove the Top Case and Front Assembly.
3. Make sure that the Moving guide preparations are
in the Eject Position.
4. Turn the LDG Belt in the appropriate direction
shown in Fig. M1 until the Moving guide prepara-
tions come to the Eject Position. Stop turning when
the preparations begin clicking or can not be
moved further. However, the tape will be left wound
around the cylinder.
5. Turn the LDG Belt in the appropriate direction con-
tinuously, and the cassette tape will be ejected.
Allow a minute or two to complete this task.
B.
Method to place the Cassette Holder in the tape-
loaded position without a cassette tape
1. Disconnect the AC Plug.
2. Remove the Top Case and Front Assembly.
3. Turn the LDG Belt in the appropriate direction
shown in Fig. M1. Release the locking tabs shown
in Fig. M1 and continue turning the LDG Belt until
the Cassette Holder comes to the tape-loaded
position. Allow a minute or two to complete this
task.
Moving guide T preparation
(Eject Position)
LDG Belt
Push the locking tab gently to unlock
when loading without a cassette.
Side View
Moving guide S preparation
(Eject Position)
Push the tape
to load it.
UNLOAD
/EJECT
LOAD
Fig. M1
Top View
Fig. M2
Bottom View
Cam Gear
LDG Belt (B)
UNLOAD
/EJECT
Summary of Contents for DVDR600VR/37
Page 26: ...1 6 1 E9480IB OPERATING CONTROLS AND FUNCTIONS DVDR600VR 37 ...
Page 27: ...1 6 2 E9480IB ...
Page 28: ...1 6 3 E9480IB ...
Page 29: ...1 6 4 E9480IB MRV700VR 17 ...
Page 30: ...1 6 5 E9480IB ...
Page 31: ...1 6 6 E9480IB ...
Page 32: ...1 7 1 E9480IBR REMOTE CONTROL OPERATION DVDR600VR 37 ...
Page 33: ...1 7 2 E9480IBR ...
Page 34: ...1 7 3 E9480IBR MRV700VR 17 ...
Page 35: ...1 7 4 E9480IBR ...
Page 41: ...1 8 6 E9480DC Fig D9 22 Deck Pedestal 23 Front Bracket R iLink Cable S 25 S 25 S 26 S 27 A ...
Page 91: ...Digital Board Unit Top View DVD Section 1 12 65 1 12 66 ...
Page 92: ...Digital Board Unit Bottom View DVD Section 1 12 67 1 12 68 ...
Page 93: ...Digital Board Unit Test Point View DVD Section 1 12 69 1 12 70 ...
Page 155: ...Directions For Use EN 4 VAD8041 3 3 Directions For Use Not applicable ...
Page 181: ...EN 30 VAD 8041 7 Electrical Diagrams and Print Layouts ...
Page 200: ...Spareparts List EN 49 VAD8041 10 DVD M TR 22003_001 300604 ...