181
6.3
Capacitor stress check
v
6.4
Capacitor life calculation
v
6.7
Power off/on interval
v
6.8
Mode cycling / OSD check
v
6.10 MTBF
demo
v v v v
6.11 Acoustic
noise
v v v
6.16
Mechanical assembler quality
v
v
6.17
Vibration (2G/3 axial)/Thermal cycling
v
v
6.18
Electro Static discharge (ESD)
v v
7
Environment Reliability tests
7.1
Cold, non operational and packed
v
7.2
Dry heat, non operational and packed
v
7.3
Thermal step stress, operational and non packed
v
v
7.4
Cold start up, operational and non packed
v
v
7.5
Cold storage, operational and non packed
v
7.6
Dry heat, non packed and w/o operational
v
7.7
Altitude (Low air pressure) (PDP and CRT)
v
8
Mechanical ( Transportation ) Tests
8.1
Non operational and packed random vibration test
v
v
v
v
8.2 Operational
vibration
test
v v v v
8.3 Drop
test
v v v v
8.4 Boundary
drop
test
v v v v
8.5 Cold
drop
test
v v v v
8.6 Half-sine
shock
test
v v v v
8.8 DBC
v
8.10
Mechanical Aspect and Tests
8.10.2
Stand base warpage
v
v
8.10.3
Positioning (slant, assembly)
v
v
8.10.5
Stability (tilt over)
v
8.10.7
Wobbling test (main body vs. stand base)
v
8.10.9
Hinge cycling test (foldable set)
v
8.10.11 Wall mount (VESA spacing )
v
8.10.12 Cosmetic and appurtenance (assembly)
v
v
9
HALT Tests
9.1 Voltage
test
v v
9.2 Thermal
step
stress
test
v v
9.3
Rapid thermal transition test
v
v
9.4 Vibration
step
stress
test
v v
9.5 Combined
test
v v
10
Compatibility Test
v
11
Winlog
12
DFMEA
13
DFSS of critical parameter
14
DQE Test Plan
Summary of Contents for BDL3215E/00
Page 69: ...69 4 Remove the BKTs and the main frame a Remove all the screws as follow ...
Page 71: ...71 6 Remove the speakers and the BKTs ...
Page 75: ...75 ...
Page 79: ...79 3 Select Serial to make Port COM1 and BAUD Rate 115200 ...
Page 83: ...83 b Double click or appear as follow c Click LoadFile it will show the picture as follow ...
Page 102: ...102 102 ...
Page 103: ...103 15 Monitor Exploded View BDL3215E 00 ...
Page 104: ...104 104 BDL4225E 00 ...