177
9.2 EMC Requirements
Supplier DVT EMI test result must be submitted prior to DVT samples delivery, and PVT EMI test result must be
submitted again prior to PVT samples delivery. This also has to meet Philips’ immunity testing specification.
9.3 RoHS
The restriction about the use of certain hazardous substances. Lead, Cadmium, Mercury, Hexavalent Chromium,
Polybrominated Bipheny1 (PBB) and Polybrominated Bipheny1 Ether (PBDE)(flame retardant).
9.4 WEEE
Producer (Philips) responsible for retailer takes back schemes and recycling.
--System implemented.
--Collection and recycle targets.
9.5 Ongoing Regulatory
There's a possibility that other regulatory certificates will be required during the life of the product. It is the
responsibility of the supplier to provide related documentation.
10. DQE Test Items Template
Product Release Test: DQE/DQA:
The objective of Design Quality Assurance process is to define the activities to be taken by concerning within the
Product Creation Process to manage the quality and reliability of products in a more coherent and systematic
approach.
The scope of Design Quality Assurance process covers all activities to ensure the design quality and reliability in
Product Creation Process that starts from RFQ, Kick-off, EVT, DVT and PVT, Product release phase & Pilot run and
CR & MP phase.
Design Quality Assurance procedure covers the system flow charts and the activities described as below.
a) System Flow Chart
b) Specification input and update
The product specification shall be initiated by MMD and supported by concerned engineering department such as
E/M/S, Safety/Approbation Group and DQE before RFQ. It must be updated in each product creation milestone.
DQE engineers will be responsible to make product quality and reliability definition based on the product
characteristics and requirements.
c) Design quality evaluation capability qualification
During the product creating process, the DQE has to support to regulate the supplier design quality and reliability
evaluation capability to ensure the supplier is qualified to create the best quality and reliability product to provide to
MMD.
Summary of Contents for BDL3215E/00
Page 69: ...69 4 Remove the BKTs and the main frame a Remove all the screws as follow ...
Page 71: ...71 6 Remove the speakers and the BKTs ...
Page 75: ...75 ...
Page 79: ...79 3 Select Serial to make Port COM1 and BAUD Rate 115200 ...
Page 83: ...83 b Double click or appear as follow c Click LoadFile it will show the picture as follow ...
Page 102: ...102 102 ...
Page 103: ...103 15 Monitor Exploded View BDL3215E 00 ...
Page 104: ...104 104 BDL4225E 00 ...