2-1-3
T6500MEN
STANDARD MAINTENANCE
[ 21PV375/(01, 07, 58, 39) ]
Service Schedule of Components
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / Audio Control Head / Full
Erase Head) using 90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
H: Hours
: Check
I
: Change
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 H
2,000 H
3,000 H
4,000 H
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B587
Tension Lever Assembly
I
I
B31
AC Head Assembly
I
B573,B574
Reel S, Reel T
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
B73
FE Head Assembly
I
B133
Idler Assembly (HI)
I
I
B410
Pinch Arm Assembly
I
I
B414
M Brake (SP) Assembly (HI)
I
I
B416
M Brake (TU) Assembly (HI)
I
I
B525
LDG Belt
I
I