16
INSTALLATION
5.
Setting up the shelves (MPR-722)
Four shelves are packaged at the bottom of the chamber. Set the shelves firmly in place on the shelf
stoppers at the standard locations (4 locations) below.
1) The sixth hole under the second screw from the top (top screw) [Fig. 3]
2) The first hole under the fifth screw from the top.
3) The sixth hole under the seventh screw from the top
4) The first hole under the tenth screw from the top.
<Important>
Never put the stored item on the bottom of the chamber. Always put them on the shelf or in the drawer (in
the case of MPR-722R).
Fig. 3
Shelf support
Shelf stopper
Second screw
from the top