PFT Conveying Pump ZP 3 XL MIX Part 2 Overview – Operation - Spare Parts Lists
Maintenance
Fehler! Formatvorlage nicht definiert.
39
13.8 Measures Taken after Maintenance
After ending the maintenance work and before switching on the machine for
the first time, perform the following steps:
1.
Check all initially unscrewed fasteners for tight seat.
2.
Check whether all initially removed protective devices and guards are
installed again properly.
3.
Ensure that all utilised tools, materials and other equipment are removed
from the work area.
4.
Clean the work area and remove possibly leaked materials, e.g. liquids,
processing material, etc.
5.
Ascertain that all safety devices of the equipment are functioning flawlessly.
13.9 Decommissioning in Emergency
In danger situations, machine motions must be stopped very
quickly and power supply cut out.
Decommissioning in Emergency
In danger cases, proceed as follows:
1.
Turn off the main switch immediately.
2.
Secure the main switch with a lock against reactivation.
3.
Inform the person responsible at the operation site.
4.
Alarm a medical practitioner and fire fighters.
5.
Rescue persons from the danger zone, initiate first aid
measures.
6.
Keep access roads free for rescue vehicles
After the Rescue Measures
7.
If the severity of the emergency so-requires, inform the
responsible authorities.
8.
Commission professionals with the task of eliminating the
fault.
WARNING!
Danger Through Premature Reactivation!
Reactivation poses life hazard for all persons within
the danger zone.
Therefore:
– Prior to reactivation, ensure that no more
persons are within the danger zone.
9.
Check the system prior to reactivation and ensure that all
safety equipment is installed and is functional.