PFT Conveying Pump ZP 3 XL MIX Part 2 Overview – Operation - Spare Parts Lists
Putting the Pump into Operation
Fehler! Formatvorlage nicht definiert.
25
Fig. 29: Turning on the vibrator
In the first mixing process, turn the multiple-contact switch in
position "Hand" and hold the switch for so long until the material
falls on the vibrator sieve.
Subsequently turn the multiple-contact switch for vibrator (vibrator
sieve) on position "Automatic".
9 Putting the Pump into Operation
9.1 Turning on ZP 3 XL
Fig. 30: Turning On ZP 3 XL
After Emptying the Drum Mixer:
Turn on the control voltage of ZP 3 XL MIX via the green press
button and let it run for so long until mortar is discharged at the
mortar hose end.
HINT!
Never let the pump run dry, since the service life of
the pump will be shortened.
9.2 Connecting the Spray Device
Fig. 33: Connect the spray device and air
hose
1.
Turn off the control voltage via the red pressure sensor.
2.
Connect the spray device (1) to the mortar hose (2).
3.
Connect the air hose (3) to the spray device (1) and to the
pressure switch (4). Guarantee that the air cock (5) is closed
at the spray device (1).
4.
Turn on the control voltage on the green press button.
DANGER!
Never loosen the hose couplings as long as the
material hoses are not pressure-less (check the
mortar pressure manometer)! Mix material could
escape under pressure and lead to serious injury,
especially to the eyes.
Fig. 34 Open the spray device air cock
5.
Turn on the control voltage via the green press button.
1
3
2
4