RISK ASSESSMENT - OVERVIEW

The Australian Standard for Waterless Composting Toilets (AS/NZS1546.2:2008) requires that a Risk 

Management Plan be provided to inform Rota-Loo Operators and Users how to cope with unusual or 

emergency situations.

Most of these issues are dealt with in the Operations Manual. This Risk Management Plan contains 

additional information and refers to the Operations Manual to demonstrate that a Risk Management 

Analysis has been carried out and to provide additional support to operators and users if required.

Design and Operation of Rota-Loo

Inherent in the design of the Rota-Loo are factors that mitigate many of the risks, however it is essential

to understand that some care and maintenance is required.  The design of the Rota-Loo intends to ensure 

effective composting occurs in most environments with little operator effort (see Page 2 - The Composting 

Process for greater understanding), however some occurrences may render the Rota-Loo ineffective.

PLEASE READ THIS OPERATION MANUAL CAREFULLY

IT IS IMPORTANT THAT YOU MAINTAIN THE ROTA-LOO PROPERLY

17

RISK ASSESSMENT  

This assessment is based on the criteria set out in AS/NZS 1546.2:2008 Appendix J for WCT deemed to be

acceptable risk.

Inspections by Authorities

The Rota-Loo is a fully contained WCT system that has no need for inspection or maintenance by any 

outside agent or authority for safe operation. The design cycle time for waste composting is 12 months so 

should an authority require regular inspection, 12 monthly or greater is sufficient.

The Operations Manual contains sufficient information for the operator / user to carry out all servicing and

maintenance tasks and includes a Trouble-Shooting guide to address most unusual situations. The

manufacturers contact details are included on the serial number plate for contact in unknown situations.

Storage of, and access to Uncomposted Material

Being fully self contained, all uncomposted waste is retained inside the Rota-Loo in the controlled aeration

and drainage system until fully composted. All material is held inside the bin / bucket into which it is 

deposited and moved only by rotating the turntable, which does not require operator contact with the 

waste. The Operations Manual includes instruction to wear gloves when rotating to ensure random 

contact with skin is not possible.

Service and maintenance access is by a door on the Rota-Loo. The door is securely fitted with catches

and note is made in the Installation Manual that the installer should consider security of access against

unauthorised persons (e.g., small children) in the placement of and access to the Rota-Loo.

Waste is only removed from the Rota-Loo when fully composted and is removed by removing the entire

bin and emptying (instruction to bury as per Regulatory requirements) - with instruction to wear gloves,

even the composted material does not come into contact with persons.

An option noted in the Operation Manual is for the possibility in very high use situations for 

additional bins to be purchased to extend the composting time outside the Rota-Loo. In these cases 

the first part of the composting (approx 6 months) will occur in the Rota-Loo controlled environment. 

Instruction in the Operations Manual includes the need to store extra bins outside the Rota-Loo for 

additional composting time in a flat, safe place.

End Product Quality

Rota-Loos have been operating in diverse climates from cold and alpine to tropical for many years 

achieving effective composting results and safe end product quality. Records of testing date back to 1975

showing end product quality conforming to AS/NZS 1546.2:2008 standards.

Summary of Contents for ROTA-LOO Maxi RL2000

Page 1: ...RL2000 Owners Manual Compostable Batch Cycle Toilet System Proudly manufactured in Australia by PFG Group Victoria 87 93 Tramway Road Morwell Victoria 3840 www rotaloo com au...

Page 2: ...e under cover OceanaMark OPMK30059 AS NZS 1546 2 PFG Group Victoria Pty Ltd is a Quality Assured company certified as compliant to ISO9001 2015 AS NZS 1546 2 2008 is the Standard that sets out the req...

Page 3: ...omposition it is important to keep the moisture containment of the material below 70 and ideally between 50 and 60 As fecal matter is 70 80 moisture and urine about 95 for a WCT to work correctly ther...

Page 4: ...nment Upon full rotation bringing the original bucket back rotation brings it back to the pedestal composting should be complete and the Humus can be disposed of Composting time is dependent on the pi...

Page 5: ...o to sit Installing the ventilation pipe work including vent pods inlet fan and Turbo Vent Connecting the Pedestal waste chute and Rota Loo Final checks before use 4 PREPARATION BUILDING DESIGN Space...

Page 6: ...ny excess liquid your site needs to have a patch of level diggable ground adjacent to the building If your building is going to have a suspended concrete floor it is best not to use the chutes as form...

Page 7: ...et inlet Filter needs to be located lower than the Pedestal otherwise you will draw air from the toilet cubicle rather than where the air inlet is located To draw warm air down from ceiling cavities t...

Page 8: ...he pedestal in position and check that with the waste chute centre lined up there is adequate clearance of the pedestal to walls 2 Drill a small hole in the centre of the marked chute hole position th...

Page 9: ...ve floor Remove the Waste Chute and cut off the measured distance from the length of the Waste Chute NB one end of the Chute has a socket which is provided for when more than one Chute are joined toge...

Page 10: ...et pipe see figure adjacent and should be positioned on the side of the unit approximately 200mm from the bottom The air inlet is attached to the 1OOmm 45 connector From the connector run the air inta...

Page 11: ...ural process is complete Make sure the vent cap is at least 600mm above the ridge line of your roof so that you don t experience down drafts Trees close to the vent cap can also cause down draft probl...

Page 12: ...to and slightly lower then the Rota Loo on the North side under a Soltran enclosure see picture Page 5 Connect the Rota Loo to the ELT via pipe rigid or flexible between the 40mm pipe nipples Connect...

Page 13: ...rd against disease transmission OPERATIONS OPERATING THE ROTA LOO Each installation will be slightly different because we all have different lifestyles and diets and we live in different climates Rota...

Page 14: ...ota Loo when bin is full and rotated the bin presented for use needs to be emptied Open the door rotate the full bin as noted above and remove the bin presented Under normal use this bin will have bee...

Page 15: ...nt to a minimum and wherever possible use only biodegradable disinfectant When using disinfectant use it only on a damp sponge around the pedestal and seat areas to prevent any spillage Be careful tha...

Page 16: ...ed or an excess liquid handling system should be constructed If the turntable won t rotate Check for obstructions On the RL650 the bins are quite close to the chamber sides and it may be that a bin ha...

Page 17: ...ic rate of aerobic bacteria therefore increasing the compost rate and producing less gases to attract the flies It is also recommended that a pyrethrum natural insect repellent spray or powder be adde...

Page 18: ...nusual situations The manufacturers contact details are included on the serial number plate for contact in unknown situations Storage of and access to Uncomposted Material Being fully self contained a...

Page 19: ...lking Material is Fed in While the addition of bulking material is recommended it is not essential for effective composting The use of toilet paper and the design to drain the compost pile of moisture...

Page 20: ...n provides for a factor of safety in time for composting In the case of very high use when compost may be removed before the designed 12 months instructions stipulate storing in additional bins Operat...

Page 21: ...ve and is recommended RL650 and RL950 Lids can be removed from outside the unit ROTA LOO WARRANTY We stand by our product and provide as much support as we can The Rota Loo and associated products are...

Page 22: ...use accident or alteration or damage caused by fire flood acts of God or any other casualty 2 Parts and accessories not sold by PFG Group Victoria Pty Ltd or damage resulting from the use of such item...

Page 23: ...fan 12 volt Solar fan or 240 volt fan complete with power lead Accessories RL2000 filter pack of 8 filters 1 litre bottle of bio stimulant Any optional items ordered will be shown on the batch release...

Page 24: ...900 Use gloves eye protection and a dust mask to protect yourself from any residual pathogens that may exist Bury under 300mm of soil for 3 months or as required by your local authority If contact is...

Reviews: