background image

5

3.2. Fitting The Exhaust Line

When fitting the exhaust line take account of the

instructions in the operating instructions for the
backing pump (Operating Instructions 
MVP 015-2; PU 0012 BN).

The exhausted process gases and vapours can

represent a health hazard and can also be envi-
ronmentally damaging.
Comply with all the gas manufacture's safety
instructions.

3.1. Preparations For Installation

Do not carry out any unauthorized 

modifications or alterations to the turbo pumping
station.

– Only remove the blank flange on the high and fore-vacuum

side immediately before connecting.

– The lubricant reservoir on turbopumps is fitted and filled

ready for operation.

– Permissible magnetic field 

4 mT.

– Set up the pumping station on a horizontal surface.
– In order to avoid the build-up of heat when operating the

pumping station, the minimum distances to walls and adja-
cent units should be observed (as shown in the following
illustration).

3. Installation 

50

50

3.3. Venting Units

Turbomolecular Drag Pumps TMH/TMU 071 P can be 
manually vented with the venting screw (condition on
delivery).

Venting time to atmospheric pressure minimum

30 seconds.

Venting Valve TVF 005 (Accessory)

The Venting Valve TVF 005 can be used in conjuction with the
TC 600 to vent the TMH/TMU 071 P.
Control is via the setting which has been pre-selected on the
Electronic Drive Unit TC 600.
The venting mode on the TVF 005 is selectable via the 
DCU 001.

(Dimensions in mm)

Summary of Contents for TSH 071 E

Page 1: ...Operating Instructions Turbomolecular Drag Pumping Stations Economy Version TSH 071 E TSU 071 E PT 0067 BE A 0105...

Page 2: ...6 3 5 Connecting The Vacuum System 6 3 6 Cooling 6 3 7 Connecting The Casing Heating 6 3 8 Connections Diagram 7 4 Operations 8 4 1 Lubricant Filling 8 4 2 Before Starting 8 4 3 Starting 8 4 4 Switchi...

Page 3: ...hen the unit is operated in environments which require other protection classes the necessary measures must be taken Do not carry out any unauthorised conversions or alterations to the turbo pumping s...

Page 4: ...the Display And Operating Unit DCU OO1 The Display And Operating Unit DCU OO1 serves to control and monitor the pumping station The DCU can be detached from the pumping station and ope rated with the...

Page 5: ...umps is fitted and filled ready for operation Permissible magnetic field 4 mT Set up the pumping station on a horizontal surface In order to avoid the build up of heat when operating the pumping stati...

Page 6: ...ng is switched off As far as possible thermally insulate the heating sleeve and pump casing during installation When heating do not touch the pump casing and heating sleeve The relay box of the casing...

Page 7: ...release Motor turbopump Pumping station Heating Reset Standby PWM ON touch relation 25 75 Switching output 1 24 VDC max 50 mA Switching output 2 24 VDC max 50 mA GND Relay box Heating Mains input heat...

Page 8: ...or is abnormally high the valve can be opened when the pumping station is running Once the final pressure has stabilized the valve can be closed again HINWEIS 1 2 8 7 6 3 4 5 Display And Operating Un...

Page 9: ...levant operating instructions see Section 2 3 6 1 Lubricant The bearing on the diaphragm vacuum pump is lubricated for the duration of its working life The lubricant reservoir on the turbopump should...

Page 10: ...th the Code of Federal Regulations CFR 49 Part 173 240 Definition and Preparation We will carry out the decontamination and invoice this work to you if you have not attached this note This also applie...

Page 11: ...11 8 1 Dimensions 300 338 150 100 300 Threaded holes 4xM4 for securing the heating relay box...

Page 12: ...M 041 902 T PM 800 542 BN Water cooling PM 016 000 T PM 800 546 BN Sealing gas Valve PM Z01 142 Protective grill DN 63 PM 006 597 R Splinter shield DN 40 PM 006 375 X DN 63 PM 006 376 X Pressure Gauge...

Page 13: ...The repair and or service of vacuum components will only be carried out if a correctly completed declaration has been submitted Non completion will result in delay The manufacturer could refuse to acc...

Page 14: ...e product specified below is in accordance with the provision of EU Machinery Directive 98 37 EEC Annex II A EU Electromagentic Compatibility Directive 89 336 EEC and EU Low Voltage Directive 73 23 EE...

Page 15: ...l Bldg 690 Sukhumvit Road Klongton Klongtoey Bangkok 10110 telephone 662 259 6244 telefax 662 259 6243 U S A Pfeiffer Vacuum Inc 24 Trafalgar Square Nashua NH 03063 1988 USA telephone 1 603 578 6500 t...

Reviews: