3. Shut off the cooling water flow.
4. Vent the screw pump to atmospheric pressure via the vacuum side.
5. Ensure that you do not vent the vacuum chamber through the screw pump.
6. Switch off the process- and pump-specific media supply (e.g. the sealing gas supply).
Operation
38/62