6.0 Maintenance 

The PermaSEAL Basement Sump and Pump System requires minimal maintenance, however it is strongly 
recommended that the unit is serviced quarterly during the first year. It is essential that the unit is serviced at least 
annually thereafter. To clean out the unit you must first turn off the power supply and ensure that it cannot be 
inadvertently turned back on (i.e. remove the fuse). Now remove the access cover to gain access to the pump. Next 
you must remove the pump from the tank by disconnecting the pipe work and lifting the pump out. It is advisable to 
check the underside of the pump to ensure there is no build up of debris around the pump and the float switch as 
this can often lead to poor pump performance or damage to the pump itself. You must also clean out the tank 
ensuring that there is no debris in the bottom of the tank. Now that the tank is clean you must reconnect the pump 
to the pipe work and check the function of the pump prior to replacing the access cover. 

Please note that we recommend that the Alarm is tested monthly as per a fire alarm and the battery be replaced 
every 2 years. 

With dual pump systems it is recommended that the master and back up pump are alternated when the system is 
serviced and the backup pump tested. 

 

7.0 Health and Safety 

In order to minimise the risk of accidents in connection with the service and installation work, the following rules 
should be followed. 

 

Do not ignore health hazards.  

 

Observe strict cleanliness. 

 

Bear in mind the risk of electrical accidents. 

 

Use a safety helmet, safety goggles and protective shoes. 

 

All personnel who work with sewage systems must be vaccinated against diseases to which they may be 
exposed. 

 

A first aid kit must be close to hand. 

 

Note that special rules apply to installations in an explosive atmosphere. 

 

Special note should be taken to site health and safety warnings. 

Electrical Connections 

 

The following works should only be done by qualified and authorised electricians. 

 

Permagard disclaim all responsibility for work done by untrained and/or unauthorised personnel. 

 

Heed operating voltage (see name plate and additional labels). 

 

Take out the main fuses to isolate the mains supply from the control unit before repairs or any other 

works and ensure it cannot to energized again. 

 

As the pump is equipped with an automatic level control, there is a risk of sudden restart. 

 

Before starting check the efficiency of the protective arrangements of the pump and the monitoring 
equipment. Failure to heed this warning may cause a lethal accident. 

 

Do not put the lead ends into water! Irruption of water may cause malfunctions.  

 

If persons are likely to come into physical contact with the pump or pumped media, the earthed (grounded) 
socket must have an additional connection to an earth (ground) fault protection device (GFI). 

 

Use the pump only in accordance to the date stated on the pump’s plate.

 

 

Connection only to mains supply installed in accordance to the local regulations. For fusing of D.O.L. 

 

Starting pumps use only appropriate slow fuses or automatic circuit breakers with D characteristics. This is 

because the motor’s nominal voltage is measured at the terminal board of the pump; please consider

 the 

voltage drop of long supply cables. 

 

Replace the cable if the cable jacket is damaged. Do not pinch the cable or pull it around sharp bends. 

 

Always install the control unit in a dry and well ventilated room. Never install the control unit within the 
tank. 

Summary of Contents for PermaSEAL

Page 1: ...Page 1 BASEMENT SUMP AND PUMP SYSTEM Installation and Operation Guidelines...

Page 2: ...Page 2 Contents 1 Product Summary 03 2 Installation Guidelines 03 3 Technical Specification 08 4 Dimensions 08 5 Parts List 08 6 Maintenance 09 7 Health and Safety 09 8 Guarantee 10...

Page 3: ...or to work commencing The tank is manufactured from polyethylene and as such is extremely robust However as with any preformed tank they are susceptible to floatation and hydrostatic pressures exerted...

Page 4: ...e pump s are set up with the waste pipework float arms and alarm outside of the sump chamber to ensure correct fitting For the single pump system please follow this set up 1 Use PTFE tape around the t...

Page 5: ...ion firmly 2 For both the master and the backup mount the float arm onto the waste pipe using the jubilee clip As per fig 1 3 At this point both pumps will activate at the same time as both float arms...

Page 6: ...tion setting levels may need to be finely tuned when the pumps are in the chamber and water levels can be tested Once the pump or pumps are set up the internal waste pipe connections can be made Simpl...

Page 7: ...not exceed 150mm at any time Please ensure that when pouring the concrete backfill suitable steps are taken to prevent the concrete from entering the tank and drainage channel 8 Where groundwater is p...

Page 8: ...Parts List Locked Sealed Lid Frame with 46mm recess One or two CP 250 Pumps 50mm pressure rated pipe work including a shut off valve and non return pump connection Single pump systems have a single i...

Page 9: ...systems must be vaccinated against diseases to which they may be exposed A first aid kit must be close to hand Note that special rules apply to installations in an explosive atmosphere Special note s...

Page 10: ...placing the defective part at the company s premises inside normal working hours We exclude all liability for any consequential or other damage or losses which may occur We will not be liable if the p...

Reviews: