1.0 Product Summary 

The PermaSEAL Basement Sump and Pump System is specifically designed for the removal of ground water from 
cavity drainage membrane systems. The system comprises of an octagonal sump chamber, class leading pump(s), 
lock & seal lid and frame, high water level alarm, internal pipe-work, non-return valve and quick release shut-off 
valve for quick release of the pump(s) for servicing. 
 
The sump can be used with a single pump or twin pumps via a single discharge line. 

The unique octagonal sump shape ensures structural stability and provides eight large surfaces for inlets into the 
pump of up to 110mm via an optional wall flange. The sump chamber also features a flared base to prevent 
flotation. 

The system comes complete with a High Water Level Alarm (Battery), which acts as a warning system to alert the 
end user if the water rises above the normal operating level within the tank. The alarm is designed to activate via a 
separate float switch inside the tank that is set to activate higher than the activation point of the pump. The panel 
contains a battery that will keep the alarm operational in situations of mains power failure. 

 

2.0 Installation Guidelines 

I

t is important to note that these instructions are for guidance only and it is the contractor’s

 responsibility to satisfy 

themselves that the installation procedure is in accordance with the site conditions and good building practice, to 
eliminate any potential damage to the system either during or after installation. The installer should also satisfy 
themselves that the system can be installed in conjunction with these guidelines, prior to work commencing. 

The tank is manufactured from polyethylene and as such is extremely robust. However, as with any preformed tank 
they are susceptible to floatation and hydrostatic pressures exerted in high water table conditions. 

Please read these instructions in full prior to commencement of the installation. If you are unsure on any point then 
please ask for advice before proceeding. Our technical helpdesk is available on 0117 982 3282 from 8:30 

 5:00 pm, 

Monday to Friday. 

1.

 

The PermaSEAL Basement Sump and Pump system is only supplied with the waste outlet pre drilled. The water 
inlet(s) and also the electrical conduits will need to be located and drilled before or during the installation of the 
sump. 
 

2.

 

Select a suitable location for the pumping station. It is extremely important to site the system with permanent 
access in mind for routine maintenance of the system. 

 

3.

 

In all instances the tank MUST be positioned on a flat, level, concrete base of dimensions sufficient to fully 
support the base of the tank. Simply lay clean hardcore to the base of the excavation ensuring that it is 
consolidated to a thickness of 100mm, then lay a mass concrete to a thickness adequate for the ground 
conditions and of minimum 150mm thickness, on top of the hardcore.  

 

4.

 

Carefully position the tank onto the WET concrete base ensuring that no loose debris is inadvertently knocked 
into the base, under the tank during this procedure. Push the tank into the wet concrete by 50mm ensuring that 
the base of the tank is fully imbedded into the concrete. Position it such that the inlet and outlet pipe work is 
correctly aligned. 

 

5.

 

Once the tank is positioned connect the incoming pipe/s to the tank. To do this you must select the location and 
drill the appropriate sized inlet suitable for your incoming pipe/s (fitting not supplied).  

 
 

 

 

Summary of Contents for PermaSEAL

Page 1: ...Page 1 BASEMENT SUMP AND PUMP SYSTEM Installation and Operation Guidelines...

Page 2: ...Page 2 Contents 1 Product Summary 03 2 Installation Guidelines 03 3 Technical Specification 08 4 Dimensions 08 5 Parts List 08 6 Maintenance 09 7 Health and Safety 09 8 Guarantee 10...

Page 3: ...or to work commencing The tank is manufactured from polyethylene and as such is extremely robust However as with any preformed tank they are susceptible to floatation and hydrostatic pressures exerted...

Page 4: ...e pump s are set up with the waste pipework float arms and alarm outside of the sump chamber to ensure correct fitting For the single pump system please follow this set up 1 Use PTFE tape around the t...

Page 5: ...ion firmly 2 For both the master and the backup mount the float arm onto the waste pipe using the jubilee clip As per fig 1 3 At this point both pumps will activate at the same time as both float arms...

Page 6: ...tion setting levels may need to be finely tuned when the pumps are in the chamber and water levels can be tested Once the pump or pumps are set up the internal waste pipe connections can be made Simpl...

Page 7: ...not exceed 150mm at any time Please ensure that when pouring the concrete backfill suitable steps are taken to prevent the concrete from entering the tank and drainage channel 8 Where groundwater is p...

Page 8: ...Parts List Locked Sealed Lid Frame with 46mm recess One or two CP 250 Pumps 50mm pressure rated pipe work including a shut off valve and non return pump connection Single pump systems have a single i...

Page 9: ...systems must be vaccinated against diseases to which they may be exposed A first aid kit must be close to hand Note that special rules apply to installations in an explosive atmosphere Special note s...

Page 10: ...placing the defective part at the company s premises inside normal working hours We exclude all liability for any consequential or other damage or losses which may occur We will not be liable if the p...

Reviews: