Preparing your Facility . 35
Finding a Suitable Location for the Instrument
The following conditions should be observed:
•
The environment must be suitable for a Class 3B laser system.
•
There must be a minimum of 3 power points (1 for the spectrometer, 2 for the PC). If
your system has a deep depletion CCD you will need 2 additional power points (1 for
the CCD PSU and 1 for the recirculating water cooler).
•
The workbench must be flat and level.
•
The workbench where the spectrometer and PC are to be located should be at a
suitable height to allow the user to work comfortably.
•
Use conducting floor coverings to minimize static discharge.
•
Floor vibrations or noise from heavy manufacturing equipment can affect the
performance of the instrument.
•
Locate the spectrometer at least 5.5 meters (18 feet) away from any intense magnetic
fields.
•
Never place the instrument near a window that gets direct sunlight.
Ensure all users understand laser safety issues before locating and using the instrument.
Consult your laser safety officer and perform a risk assessment before installing the
equipment.
Summary of Contents for Raman Flex 400 Series
Page 1: ...RamanFlex 400 Series Getting Started Guide MOLECULAR SPECTROSCOPY ...
Page 5: ...Introduction ...
Page 10: ...10 RamanFlex 400 Series Getting Started Guide ...
Page 11: ...Safety Practices ...
Page 24: ...24 RamanFlex 400 Series Getting Started Guide ...
Page 25: ...Raman History Theory and Instrumentation ...
Page 32: ...32 RamanFlex 400 Series Getting Started Guide ...
Page 33: ...Preparing your Facility ...
Page 37: ...Installing your RamanFlex 400 Series ...
Page 44: ...44 RamanFlex 400 Series Getting Started Guide ...
Page 45: ...Using the RamanFlex 400 Series ...
Page 66: ...66 RamanFlex 400 Series Getting Started Guide ...
Page 67: ...Maintenance and Troubleshooting ...
Page 74: ...74 RamanFlex 400 Series Getting Started Guide ...