22
13
11
Fasten using two 1” roof
nails per capper. Fasten nail
through the black tar strip.
Leave approximately 5 1/2”
exposed to the weather.
Continue up the ridge using
the same previous steps.
Install cappers in a nice
straight row for a neat appear-
ance from a ground view.
Trim the top.
5
1/2”
CUT CAPPERS AT PEAK
10
12
12
Summary of Contents for WOOD PAVILION
Page 25: ...4 Continue on with regular instructions at step 23 25...
Page 26: ...26...
Page 27: ...27...
Page 28: ...28...
Page 30: ...30 19 20...
Page 32: ...32...