19
To install 1st row of shingles,
turn shingle upside down
with black tar line at bottom
edge facing up and attach to
roof using four 5/8” roofing
nails. Place nails approximately
3” from bottom.
Roofing Option 2:
Installing An Asphalt Roof
NOTE: Before you begin the steps below, install roof paper starting at the bottom. Be sure to overlap 2" as
you work upward. Drip edge will then be installed on all edges of the roof, using a fastener every 16".
Roofing Fasteners
Please note we do not include fasteners for asphalt shingles with our kits. This is because some states
require different fasteners than others, and because some customers have different tools than others
(hammer, nail gun, pneumatic stapler, hammer tacker, etc.).
Please use shallow depth fasteners to fasten your shingles to your 1x6 roof decking. For example:
• 5/8” long roofing nails
• Roofing staples with 5/8” leg and 1” wide crown
These fasteners will certainly be sufficient to hold the shingles to your roof in high storm winds, and will
not pierce the bottom surface of the 1x6 roof decking.
DO NOT PLACE PLYWOOD, OSB (ORIENTED STRAND BOARD) OR OTHER
DECKING ON TOP OF THE 1X6 TONGUE AND GROOVE.
It is not necessary and is too heavy for your structure.
1
Summary of Contents for WOOD PAVILION
Page 25: ...4 Continue on with regular instructions at step 23 25...
Page 26: ...26...
Page 27: ...27...
Page 28: ...28...
Page 30: ...30 19 20...
Page 32: ...32...