4X
TO
P
TOP
Once the template is in posi-
tion, square the template. Do
this by measuring diagonally
from one corner to its oppo-
site corner, then measure
diagonally between the other
two corners. These two
dimensions
MUST
be the
same. Adjust the template
until the diagonal measure-
ments are identical.
Begin by assembling the
frame of the Pavilion struc-
ture. Please note that the
Pavilion kit includes some
pre-assembled pieces.
Once the template is “square”,
mark the post locations using
the
INSIDE
corners of the
framed box on the concrete
slab with a pencil. After all
the post locations are marked
on the concrete slab, remove
the wooden template. Disas-
semble it and set the 2x4s aside
for use in step 13.
All of the corner posts will
have 2 sides notched. Turn the
notches on the post to the
outside to accept the headers.
The 2 center posts will have 3
sides notched. The unnotched
side will face inside the pavil-
ion.
4
5
4
7
6
Summary of Contents for PREMIUM VINYL PAVILION
Page 34: ...You are now ready to return to page 12 step 38 19 34...
Page 35: ...35 Notes...
Page 36: ...36 Notes...