![Pereko AGRO Multi 12 Operation And Maintenance Manual Download Page 96](http://html1.mh-extra.com/html/pereko/agro-multi-12/agro-multi-12_operation-and-maintenance-manual_1528315096.webp)
SETTINGS
12
After the power is on, ecoNET300 requires app. 1 minute in order to load the
operational system. Then, the module begins to work and indicates its condition
with LED indicators. In a connection between ecoNET300 module with a boiler
con
troller is active, a “
connection with controller”
indicator lights up. New
functions for managing ecoNET30 module are added to the main menu.
MENU
→
Information
→
ecoNET WiFi
MENU
→
Information
→
ecoNET Ethernet
MENU
→
Main settings
→
WiFi
ecoNET300 requires active DHCP server of Access Point (e.g. router)
because manual IP assignment for ecoNET300 internet module is not
supported. More information can be obtained from router configuration
software or network administrator.
LED
Condition
ecoNET300 operation condition
Power
on
Power on
off
Power off
Connection
with a
controller
on
Active connection of the
controller.
off
No connection with boiler
controller.
Connection
with WiFi
on
Connection to a programmed
wireless network is on.
off
No connection with wireless
network.
Connection
with a
server
on
Connection with
ecoNET24.com external server
is on.
off
No connection for
ecoNET24.com external server.
LED indicators of module
operation condition.
Deleting user name and
password and restoring
default settings. User:
admin,
password:
admin. Works only in
local version.
Summary of Contents for AGRO Multi 12
Page 1: ...Operation and maintenance manual for the boilers with feeder AGRO Multi...
Page 22: ......
Page 23: ......
Page 34: ......
Page 36: ...wer 13 12 2017 r...
Page 38: ......
Page 43: ...REGULATOR INSTRUCTION MANUAL ecoMAX 910R1...
Page 53: ...USER MANUAL OF CONTROLLER INSTALLATION AND SERVICE SETTINGS ecoMAX 910R1...
Page 59: ...23...
Page 83: ...47...
Page 86: ......
Page 114: ......
Page 115: ......