Operation manual
12
6 MARKING AND PACKAGING
The turnstile has the following marking:
•
on the turnstile post – a label located on the underside of the flange;
•
on the control unit – a label located on the rear panel of the control unit.
The turnstile in the delivery set (see Chapter 0) is packed into the shipping box, which keeps it
undamaged during the transportation and storage.
The shipping box dimensions are (length × width × height) ...................................... 108×66×26 mm
The shipping box has the serial number marking and the additional marking in accordance with the
design documentation and the delivery set.
7 SAFETY REQUIREMENTS
7.1 Installation safety requirements
Installation should be performed by qualified personnel only, in strict accordance with the Manual
and general electrical safety requirements for electrical and installation work.
Attention!
•
Only serviceable tools should be used.
•
All the connections should be performed only after the CU is disconnected from the
power supply.
•
Cables should be laid in accordance with electrical safety requirements.
•
The turnstile is heavy, hold it to prevent the fall!
7.2 Operation safety requirements
Observe general safety requirements for use of electrical equipment.
Don'ts!
•
Do not use the turnstile under conditions that do not comply with the requirements of
Chapter 2 of this Manual;
•
Do not mount the control unit on the current-conducting surfaces or install in wet
premises;
•
Do not open the CU cover prior to the power supply switching off;
•
Do not replace the fuses prior to the CU power supply switching off.
The turnstile operates within voltage range from 198V AC to 242V AC only. In case of the voltage
jump, exceeding the operating voltages, use a voltage stabilizer.
8 INSTALLATION INSTRUCTIONS
8.1 General Recommendations
It is recommended:
•
to mount the turnstile on steady and level concrete (grade 400 or higher, strength group
V22.5), stone or similar foundations at least 150mm thick;
•
to level the foundation so that the anchoring points of the turnstile post lie in the same
plane;
•
to apply reinforcing elements (300×300×300mm) for installation on less steady foundation;
•
to mark the mounting holes according to the enclosed installation instructions (see Fig.7);
•
to control the vertical position of the turnstile post during installation.
8.2 Tools and equipment required for installation
•
1.2–1.5 kW hammer drill;
•
Ø14 mm hard-alloyed drill for anchor bolts;
•
Ø 5 hard-alloyed drill for CU;
•
Wall chaser for laying the cable;
•
Phillips head screwdriver №2;