Table 3. Potential problems and their remedies 

 

Fault 

Possible cause 

Remedy 

The turnstile does not work after its power-

up (the 

“Power”

 toggle switch is in the 

“I”

 

position, the 

“Battery”

 toggle switch is in 

the 

“O”

 position). The indicators on the CU 

front panel and RC are off. 

The 

"220V/1A"

 fuse is 

burnt out 

Turn the 

“Power”

 toggle 

switch to the 

“O”

 position.  

Disconnect the CU from the 

AC mains and replace the 

fuse on its lower panel (see 

Fig. 3)  

The CU indicators 

"Power” 

and 

“24V/2A”

 

are on but the 

"24V"

 indicator on the CU 

and RC is off.  

The 

"=24V/2A"

 fuse is 

burnt out likely due to 

external short circuit 

(for example, in power 

cable connectors)  

Turn the 

“Power”

 toggle 

switch to the 

“O”

 position. 

Disconnect the CU from the 

AC mains, clear the circuit 

and replace the fuse on the 

lower panel of the CU  

In the case of the AC mains failure and 

when the CU is powered up from the built-

in SPS (the 

“Battery”

 toggle switch is in 

the 

“I”

 position), the turnstile does not 

work, the indicators on the CU front panel 

and RC are off  

The 

"Bat/2A" 

fuse is 

burnt out 

Turn the 

“Battery”

 toggle 

switch in the 

“O”

 position. 

Disconnect the CU from the 

AC mains and eliminate the 

short circuit. Replace the 

fuse on the CU lower panel  

In the case of the AC mains failure and 

when the CU is powered up with the 

external SPS via the 

“Bat=24V”

 connector 

(the 

“Battery”

 toggle switch is in the 

“I”

 

position, the 

“Bat/2A”

 fuse is not 

installed), the turnstile does not work, the 

indicators on the CU front panel are off 

The external SPS 

failure 

Turn the 

“Battery”

 toggle 

switch in the 

“O”

 position. 

Disconnect the CU from the 

external SPS. Replace the 

external power supply. 

All other faults shall be cleared by the manufacturer or the manufacturer’s representative. 

10  MAINTENANCE 

The turnstile maintenance during the whole operating period is performed by the manufacturer or 

the manufacturer’s representative. 
For cleaning the turnstile post and the barrier wings it is recommended to use liquid purifiers, 

containing liquid ammonia. For cleaning the filler panels it is recommended to use purified 

turpentine (for polycarbonate plastic) or liquid purifiers, containing liquid ammonia (for prestressed 

glass). 

11  TRANSPORTATION AND STORAGE 

The turnstile in the original package can be delivered by any means of transportation. 
During the transportation boxes can be stacked in 3 rows. 
The storage of the turnstile is allowed indoors at ambient temperature between –40°C and +45°C 

and at relative air humidity up to 70% at +27°C. 
After the transportation at temperatures below zero or at high  air humidity the turnstile must be 

kept unpacked for not less than 24 hours indoors within normal climate conditions prior to putting it 

in operation. 

Summary of Contents for RTD-03S

Page 1: ...OPERATION MANUAL RTD 03S Waist high Rotor Turnstile...

Page 2: ...Waist high Rotor Turnstile RTD 03S Operation manual...

Page 3: ...anical unblocking of the turnstile 11 6 MARKING AND PACKAGING 12 7 SAFETY REQUIREMENTS 12 7 1 Installation safety requirements 12 7 2 Operation safety requirements 12 8 INSTALLATION INSTRUCTIONS 12 8...

Page 4: ...egory U4 operation in premises with climate control Operation of the turnstile post is allowed at ambient temperature between 1 C and 45 C and relative air humidity up to 98 at 35 C The control unit i...

Page 5: ...ppendix 1 Wireless remote control kit 1 Note Wireless remote control kit consists of a receiver and 2 transmitters tags with operation range up to 40 m 5 BRIEF DESCRIPTION 5 1 Main features The turnst...

Page 6: ...1 Four barrier wings 6 are mounted on the rotary post 1 The filler panels 7 are set into the barrier wings 6 with the fastenings 15 On the rotary post 1 cover 3 there is the mechanical release lock 4...

Page 7: ...panel which are intended for setting the turnstile operating modes The LED indicators are located above the buttons The button in the middle hereinafter the STOP button is intended to set the turnstil...

Page 8: ...RTD 03S Waist high rotor turnstile 7 Figure 3 Control unit...

Page 9: ...cable connector Control Power cable connector DC 24V External DC power supply connector Bat 24V AC power cable input 220V Entry for intrusion detector and siren cables Alarm Connections for intrusion...

Page 10: ...he X5 connector of the processor module see Fig 9 If the jumper is fixed pulse control the jumper is not fixed potential control The control unit is supplied with pulse control mode preset the jumper...

Page 11: ...Pass Sensor Pwr failure and Bat failure have the galvanic decoupling a Control elements of an external device a normally open relay contact b Control elements of an external device a circuit with ope...

Page 12: ...locking of the turnstile Possibility to unblock the turnstile manually is specially provided for unblocking the turnstile in the emergency mode at all the power supplies failure AC mains switching off...

Page 13: ...l safety requirements for use of electrical equipment Don ts Do not use the turnstile under conditions that do not comply with the requirements of Chapter 2 of this Manual Do not mount the control uni...

Page 14: ...raceways for the control cable 10 and the power cable 11 as shown in Fig 7 and according to your checkpoint layout Figure 7 Marking layout for RTD 03S installation dotted line shows the dimensions of...

Page 15: ...ttings 14 holes Check the strong fastening of the barrier wings 6 and the filler panels 7 8 Check free rotation of the rotary post 1 Unblock the rotary post with the mechanical release key 5 see Claus...

Page 16: ...ector put remote control cable 13 through its cable inlet inside the control unit and connect it to the X3 and X4 connectors on the processor module as per Fig 9 11 Set the CU Power toggle switch and...

Page 17: ...s and the AC power cable operability Prior to the turnstile power up set the Power toggle switch and the Battery toggle switch to the O position Install the Bat 2A fuse which is provided together with...

Page 18: ...nd for the new passage mode entered by the RC will be enquired in the command queue of the turnstile After the barrier wing is reset to the reset state the command from the command queue will be perfo...

Page 19: ...Grn_L or LED Grn_R output is active depending on the set direction The barrier wings rotation in the set direction is allowed 3 Bidirectional single passage open for one by one person passage in each...

Page 20: ...will start blinking with interval of 2 seconds At the further battery discharge the CU will automatically switch off When the AC mains is restored the turnstile turns to the AC mains the Power toggle...

Page 21: ...e and when the CU is powered up with the external SPS via the Bat 24V connector the Battery toggle switch is in the I position the Bat 2A fuse is not installed the turnstile does not work the indicato...

Page 22: ...Guide barriers set posts polished tubular stainless steel dia 50 mm rails beechwood ashwood filler panels tinted polycarbonate plastic mnemonic indication units RB 03S guide barriers set Guide barrier...

Page 23: ...r stainless steel dia 50 mm rails polished tubular stainless steel dia 32 mm filler panels tinted polycarbonate plastic symbol indication units RB 03T guide barriers set Guide barriers set posts polis...

Page 24: ...ut for installation of turnstile with guide barriers set electric raceway to the control unit is laid from the turnstile post center in the direction of the control unit according to the layout Figure...

Page 25: ...PERCo Polytechnicheskaya str 4 block 2 194021 Saint Petersburg Russia Tel 7 812 247 04 64 E mail export perco com support perco com www perco com...

Page 26: ...www perco com...

Reviews:

Related manuals for RTD-03S