background image

RTD-03S Waist-high rotor turnstile 

13 

  flat blade screwdriver; 

  Knife

 

assembly; 

  Allen key S=5,  

  Allen key S=8; 

  Plumb-line and level;  

  Measuring tape 2m 

8.3  Installation procedure 

 

Note! 

The manufacturer shall not be liable for any damage caused in  the result of improper 

installation and declines any claims arising thereof in case if the installation is not in 

compliance with the instructions provided in this Manual. 

Recommendations for preparation of mounting holes for installation of the turnstile and railing 

posts are given for the "SORMAT" PFG IH 10 anchor bolts for steady concretes. 
The turnstile should be mounted by at least two persons including qualified assembler and 

electrician. 
1.  Unpack the turnstile, check the completeness as per Chapter 0 of this Manual. 
2.  Mark out the holes for the anchor bolts for the turnstile post installation and electric raceways 

for the control cable (10) and the power cable (11) as shown in Fig. 7 and according to your 

checkpoint layout. 

 

Figure 7. Marking layout for RTD-03S installation 

(dotted line shows the dimensions of the turnstile and the position of one of its wings) 

3.  Drill the holes for the cables and PFG IH 10 anchor bolts for the turnstile post mounting (3 

holes Ø16×60mm) in the floor. Insert the anchor bolts sleeves into the holes so that they do 

not stick out above the floor surface. 

4.  Lay out the control cable (10) and the power cable (11) from the control unit (8) via electric 

raceways to the turnstile post. 

5.  Unpack the turnstile post from the shipping box and carefully place it on the prepared steady 

surface. Take the cable connectors block (16) out of the turnstile post with flange (2) (see Fig. 

2). Connect the control cable (10) and the power cable (11) to the corresponding connectors of 

the cable connectors block (16), located inside the turnstile post with flange (2) according to 

the connections scheme (see Fig.  9). After you carry out the connections, install the cable 

Summary of Contents for RTD-03S

Page 1: ...OPERATION MANUAL RTD 03S Waist high Rotor Turnstile...

Page 2: ...Waist high Rotor Turnstile RTD 03S Operation manual...

Page 3: ...anical unblocking of the turnstile 11 6 MARKING AND PACKAGING 12 7 SAFETY REQUIREMENTS 12 7 1 Installation safety requirements 12 7 2 Operation safety requirements 12 8 INSTALLATION INSTRUCTIONS 12 8...

Page 4: ...egory U4 operation in premises with climate control Operation of the turnstile post is allowed at ambient temperature between 1 C and 45 C and relative air humidity up to 98 at 35 C The control unit i...

Page 5: ...ppendix 1 Wireless remote control kit 1 Note Wireless remote control kit consists of a receiver and 2 transmitters tags with operation range up to 40 m 5 BRIEF DESCRIPTION 5 1 Main features The turnst...

Page 6: ...1 Four barrier wings 6 are mounted on the rotary post 1 The filler panels 7 are set into the barrier wings 6 with the fastenings 15 On the rotary post 1 cover 3 there is the mechanical release lock 4...

Page 7: ...panel which are intended for setting the turnstile operating modes The LED indicators are located above the buttons The button in the middle hereinafter the STOP button is intended to set the turnstil...

Page 8: ...RTD 03S Waist high rotor turnstile 7 Figure 3 Control unit...

Page 9: ...cable connector Control Power cable connector DC 24V External DC power supply connector Bat 24V AC power cable input 220V Entry for intrusion detector and siren cables Alarm Connections for intrusion...

Page 10: ...he X5 connector of the processor module see Fig 9 If the jumper is fixed pulse control the jumper is not fixed potential control The control unit is supplied with pulse control mode preset the jumper...

Page 11: ...Pass Sensor Pwr failure and Bat failure have the galvanic decoupling a Control elements of an external device a normally open relay contact b Control elements of an external device a circuit with ope...

Page 12: ...locking of the turnstile Possibility to unblock the turnstile manually is specially provided for unblocking the turnstile in the emergency mode at all the power supplies failure AC mains switching off...

Page 13: ...l safety requirements for use of electrical equipment Don ts Do not use the turnstile under conditions that do not comply with the requirements of Chapter 2 of this Manual Do not mount the control uni...

Page 14: ...raceways for the control cable 10 and the power cable 11 as shown in Fig 7 and according to your checkpoint layout Figure 7 Marking layout for RTD 03S installation dotted line shows the dimensions of...

Page 15: ...ttings 14 holes Check the strong fastening of the barrier wings 6 and the filler panels 7 8 Check free rotation of the rotary post 1 Unblock the rotary post with the mechanical release key 5 see Claus...

Page 16: ...ector put remote control cable 13 through its cable inlet inside the control unit and connect it to the X3 and X4 connectors on the processor module as per Fig 9 11 Set the CU Power toggle switch and...

Page 17: ...s and the AC power cable operability Prior to the turnstile power up set the Power toggle switch and the Battery toggle switch to the O position Install the Bat 2A fuse which is provided together with...

Page 18: ...nd for the new passage mode entered by the RC will be enquired in the command queue of the turnstile After the barrier wing is reset to the reset state the command from the command queue will be perfo...

Page 19: ...Grn_L or LED Grn_R output is active depending on the set direction The barrier wings rotation in the set direction is allowed 3 Bidirectional single passage open for one by one person passage in each...

Page 20: ...will start blinking with interval of 2 seconds At the further battery discharge the CU will automatically switch off When the AC mains is restored the turnstile turns to the AC mains the Power toggle...

Page 21: ...e and when the CU is powered up with the external SPS via the Bat 24V connector the Battery toggle switch is in the I position the Bat 2A fuse is not installed the turnstile does not work the indicato...

Page 22: ...Guide barriers set posts polished tubular stainless steel dia 50 mm rails beechwood ashwood filler panels tinted polycarbonate plastic mnemonic indication units RB 03S guide barriers set Guide barrier...

Page 23: ...r stainless steel dia 50 mm rails polished tubular stainless steel dia 32 mm filler panels tinted polycarbonate plastic symbol indication units RB 03T guide barriers set Guide barriers set posts polis...

Page 24: ...ut for installation of turnstile with guide barriers set electric raceway to the control unit is laid from the turnstile post center in the direction of the control unit according to the layout Figure...

Page 25: ...PERCo Polytechnicheskaya str 4 block 2 194021 Saint Petersburg Russia Tel 7 812 247 04 64 E mail export perco com support perco com www perco com...

Page 26: ...www perco com...

Reviews: