RTD-03S Waist-high rotor turnstile
13
•
flat blade screwdriver;
•
Knife
assembly;
•
Allen key S=5,
•
Allen key S=8;
•
Plumb-line and level;
•
Measuring tape 2m
8.3 Installation procedure
Note!
The manufacturer shall not be liable for any damage caused in the result of improper
installation and declines any claims arising thereof in case if the installation is not in
compliance with the instructions provided in this Manual.
Recommendations for preparation of mounting holes for installation of the turnstile and railing
posts are given for the "SORMAT" PFG IH 10 anchor bolts for steady concretes.
The turnstile should be mounted by at least two persons including qualified assembler and
electrician.
1. Unpack the turnstile, check the completeness as per Chapter 0 of this Manual.
2. Mark out the holes for the anchor bolts for the turnstile post installation and electric raceways
for the control cable (10) and the power cable (11) as shown in Fig. 7 and according to your
checkpoint layout.
Figure 7. Marking layout for RTD-03S installation
(dotted line shows the dimensions of the turnstile and the position of one of its wings)
3. Drill the holes for the cables and PFG IH 10 anchor bolts for the turnstile post mounting (3
holes Ø16×60mm) in the floor. Insert the anchor bolts sleeves into the holes so that they do
not stick out above the floor surface.
4. Lay out the control cable (10) and the power cable (11) from the control unit (8) via electric
raceways to the turnstile post.
5. Unpack the turnstile post from the shipping box and carefully place it on the prepared steady
surface. Take the cable connectors block (16) out of the turnstile post with flange (2) (see Fig.
2). Connect the control cable (10) and the power cable (11) to the corresponding connectors of
the cable connectors block (16), located inside the turnstile post with flange (2) according to
the connections scheme (see Fig. 9). After you carry out the connections, install the cable