background image

PB-SIO4

Installation

ID 19957, Rev. 0300

Page 2 - 3

® 

PEP Modular Computers GmbH

2. Installation

2.1 Board Installation

To install a PB-SIO4 piggyback proceed as follows:

ensure that the safety requirements indicated above are observed

as required, ensure that the piggyback and carrier board are properly configured 
(see appropriate documentation for configuration) 

if required, remove the carrier board and optional adapters from the system

ensure the proper orientation of the PB-SIO4 to the carrier board before installing  
(see appropriate documentation for orientation)

press the piggyback onto the carrier board until fully seated 

Caution!

Switch off all power to the system and ensure that there are 

NO

external cables connected to the carrier board or to any optional
adapters connected to the carrier board before installing the PB-
SIO4. Failure to do so could endanger your life/health and may
damage your board or system.

ESD Equipment!

Your PB-SIO4 board contains electrostatically sensitive devices.
Please observe the necessary precautions to avoid damage to
your board:

Discharge your clothing before touching the assembly. Tools
must be discharged before use.

Do not touch components, connector-pins or traces.

If working at an anti-static workbench with professional dis-
charging equipment, please do not omit to use it.

$

$

Note!

The PB-SIO4 can be installed in any free carrier board position,
and can be combined with any other type of piggyback module on a
carrier board. The only restraint here being the external interfacing
requirements, in particular, what type of cable connection is
required. It is the responsibilty of the system integrator to ensure
proper external interfacing to the PB-SIO4. 

$

$

Note!

The PB-SIO4 can be securely mounted to the carrier board via
screws and stand offs as appropriate.

Summary of Contents for PB-SIO4

Page 1: ...l service in house repair center WE BUY USED EQUIPMENT Sell your excess underutilized and idle used equipment We also offer credit for buy backs and trade ins www artisantg com WeBuyEquipment REMOTE INSPECTION Remotely inspect equipment before purchasing with our interactive website at www instraview com LOOKING FOR MORE INFORMATION Visit us on the web at www artisantg com for more information on ...

Page 2: ...PB SIO4 Quad Serial Port Piggyback RS232 Manual ID 19957 Rev Index 0300 Sep 99 The product described in this manual is in compliance with all applied CE stan dards ...

Page 3: ... PEP Modular Computers GmbH This page was intentionally left blank ...

Page 4: ...xplanation of Symbols 0 5 For Your Safety 0 6 High Voltage Safety Instructions 0 6 Special Handling and Unpacking Instructions 0 6 General Instructions on Usage 0 7 Two Years Warranty 0 8 Table of Contents 0 9 ID 19957 Rev 0300 Page 0 3 PEP Modular Computers GmbH ...

Page 5: ...roduct or example shown in this document PEP Modular Computers reserve the right to change modify or improve this document or the product described herein as seen fit by PEP Modular Computers without further notice Trademarks PEP Modular Computers the PEP logo and CXM are trade marks owned by PEP Modular Computers GmbH Kaufbeuren Germany In addition this document may include names company logos an...

Page 6: ... that electronic boards and their components are sensitive to static electricity There fore care must be taken during all handling operations and inspections of this product in order to ensure product integ rity at all times Please read also the section Special Handling and Unpack ing Instructions of this manual Attention This symbol and title emphasize aspects which if not read through carefully ...

Page 7: ...ly done by touching a metal part of your system housing It is particularly important to observe standard anti static precautions when changing piggybacks ROM devices jumper settings etc If the product contains batteries for RTC or memory back up ensure that the board is not placed on conductive surfaces includ ing anti static plastics or sponges They can cause short circuits and damage the batter ...

Page 8: ...the operational temperature range of the specific board version which must not be exceeded If batter ies are present their temperature restrictions must be taken into account In performing all necessary installation and application operations please follow only the instructions supplied by the present manual Keep all the original packaging material for future storage or warranty shipments If it is...

Page 9: ...vent of repair refunding or replacement of any part the ownership of the removed or replaced parts reverts to PEP Modular Computers and the remaining part of the original guarantee or any new guarantee to cover the repaired or replaced items will be transferred to cover the new or repaired items Any extensions to the original guarantee are considered gestures of goodwill and will be defined in the...

Page 10: ...agram 1 4 1 4 PB SIO4 External Interfacing 1 5 1 5 Carrier Board External Connectors 1 5 1 6 Technical Specifications 1 6 1 7 Applied Standards 1 7 1 8 Related Publications 1 7 Chapter 2 2 Installation 2 3 2 1 Board Installation 2 3 2 2 Software Installation 2 4 Chapter 3 3 Configuration 3 3 3 1 PB SIO4 Address Map and ID Byte 3 3 3 2 VMEbus Interrupts 3 3 3 3 Jumper Settings 3 4 3 4 Pinouts 3 5 ...

Page 11: ...Preface PB SIO4 ID 19957 Rev 0300 Page 0 10 PEP Modular Computers GmbH Chapter 4 4 Adapter AD SIO4 4 3 4 1 Product Overview 4 3 4 2 Adapter Overview 4 3 ...

Page 12: ...rd Overview 1 3 1 3 Functional Block Diagram 1 4 1 4 PB SIO4 External Interfaceing 1 5 1 5 Carrier Board External Connectors 1 5 1 6 Technical Specifications 1 6 1 7 Applied Standards 1 7 1 7 1 CE Compliance 1 7 1 7 2 Mechanical Compliance 1 7 1 7 3 Environmental Tests 1 7 1 8 Related Publications 1 7 1 8 1 General 1 7 1 8 2 PEP Modular Computers 1 7 Chapter 1 ...

Page 13: ... PEP Modular Computers GmbH This page was intentionally left blank ...

Page 14: ...al and mechanical compatibility with the extensive range of carrier boards All required VMEbus lines are available on the piggyback Optional optoisolated driver receiver supporting TxD RxD CTS and RTS Optional interface adapters with four 15 pin D sub connectors See Adapter AD SIO4 chapter this manual Extended temperature version available for harsh industrial environments 1 2 Board Overview The P...

Page 15: ... Front View Optoisolated Version 1 3 Functional Block Diagram Figure 1 2 Functional Block Diagram of the PB SIO4 ISOLATION OPTO Transceiver Transceiver DUART DUART I F Logic B3 B1 B6 B5 B2 B4 ST1 ST2 1 2 25 26 1 2 29 30 ST2 ST1 DUART DUART I F LOGIC OPTOISOLATION TRANSCEIVER Optoisolation is optional ...

Page 16: ...pin male double row flat ribbon cable connector head In conjunction with the carrier board s connectors there is also the possbility of provid ing connection to external devices using the AD SIO4 adapter This adapter utilizes either of the carrier board s flat ribbon connectors to provide 4 15 pin female Dsub con nectors One connector for each channel of the PB SIO4 Two PB SIO4 s and two of these ...

Page 17: ...n no parity and force parity 1 1 and 2 stop bits Programmable Channel Modes normal full duplex automatic echo local loopback remote loopback Counter Timer two 16 bit one for each DUART Identification Byte F7 hex DTACK Generation on board Power Supply 5V DC 5 Power Consumption 0 4A typical Temperature Range Operating 0 C 70 C Standard 40 C 85 C Extended Humidity 0 95 non condensing Dimensions Width...

Page 18: ... Safety EN60950 1 7 2 Mechanical Compliance Mechanical Dimensions IEEE 1101 10 1 7 3 Environmental Tests Vibration Broad Band IEC68 2 6 Random Vibration IEC68 2 64 3U boards Permanent Shock IEC68 2 29 Single Shock IEC68 2 27 1 8 Related Publications 1 8 1 General VMEbus Specification Revision C 1 The MC68681 data sheet from Motorola 1 8 2 PEP Modular Computers Please contact PEP Modular Computers ...

Page 19: ... PEP Modular Computers GmbH This page was intentionally left blank ...

Page 20: ...PB SIO4 ID 19957 Rev 0300 Installation Page 2 1 PEP Modular Computers GmbH Installation 2 1 Board Installation 2 3 2 2 Software Installation 2 4 2 2 1 Driver Installation 2 4 Chapter 2 ...

Page 21: ... PEP Modular Computers GmbH This page was intentionally left blank ...

Page 22: ...r board before installing the PB SIO4 Failure to do so could endanger your life health and may damage your board or system ESD Equipment Your PB SIO4 board contains electrostatically sensitive devices Please observe the necessary precautions to avoid damage to your board Discharge your clothing before touching the assembly Tools must be discharged before use Do not touch components connector pins ...

Page 23: ...cables to the carrier board and optional adapters as required ensure that the carrier board optional adapters and interfacing cables are properly secured 2 2 Software Installation 2 2 1 Driver Installation Drivers are available for various operating systems but are not delivered with the PB SIO4 If required please order the appropriate driver separately For installation of any required driver plea...

Page 24: ...GmbH Configuration 3 1 PB SIO4 Address Map and ID Byte 3 3 3 2 VMEbus Interrupts 3 3 3 3 Jumper Settings 3 4 3 4 Pinouts 3 5 3 4 1 PB SIO4 Carrier Board Connector ST1 3 5 3 4 2 PB SIO4 Carrier Board Connector ST2 3 6 3 4 3 PB SIO4 to Carrier Board to AD SIO4 3 7 Chapter 3 ...

Page 25: ... PEP Modular Computers GmbH This page was intentionally left blank ...

Page 26: ...DUART2 Base Address 41 ID Byte Piggyback location B the lower position on the carrier board Base Address 81 DUART1 Base Address A1 DUART2 Base Address C1 ID Byte The PB SIO4 has an ID Byte of F7 RS232 3 2 VMEbus Interrupts Each DUART device is able to issue an interrupt request IRQ to the carrier board In the event of simultaneous interrupt requests those from DUART 1 have priority over those from...

Page 27: ...h B6 are zero Ohm resisters Before operating the PB SIO4 ensure that the jumper settings are set correctly according to the application No external VCC may be applied to the non optocoupler version and correspondingly external VCC must be applied to optocoupler versions Table 3 1 Jumpers B1 to B6 Settings According to Version JUMPERS VERSION B1 B2 B3 B4 B5 B6 closed closed closed closed open open ...

Page 28: ... header connector which provides interfacing between the PB SIO4 and CPU side of the carrier board Table 3 2 Pinout of Connector ST1 Signal Pin Pin Signal 5V Vcc 30 29 GND IA1 28 27 ID0 IA2 26 25 ID1 IA3 24 23 ID2 IA4 22 21 ID3 IA5 20 19 ID4 IA6 18 17 ID5 IAS 16 15 ID6 IDS0 14 13 ID7 N C 12 11 INT CS 10 9 INTA DTACK 8 7 RESET CLK 6 5 R W 12V 4 3 12V 5V Vcc 2 1 GND ...

Page 29: ...which provides interfacing between the PB SIO4 and the application side of the carrier board Table 3 3 Pinout of Connector ST2 Signal Pin Pin Signal RxD D 26 25 RxD D GndE1 24 23 CTSA TxD A 22 21 5V VccE1 RxD A 20 19 RTSA GndE1 18 17 CTSB TxD B 16 15 5V VccE1 RxD B 14 13 RTSB GndE2 12 11 CTSC TxD C 10 9 5V VccE2 RxD C 8 7 RTSC GndE2 6 5 CTSD TxD D 4 3 5V VccE2 RTSD 2 1 RTSD ...

Page 30: ... CON CH U P P E R 2 RTSD 1 2 50 24 5 BU4 D RxD D 25 26 49 23 3 VccE2 3 48 22 15 TxD D 4 47 21 2 CTSD 5 46 20 3 GndE2 6 45 19 1 7 RTSC 7 44 18 5 BU3 C RxD C 8 43 17 3 VccE2 9 42 16 15 TxD C 10 41 15 2 CTSC 11 40 14 4 GndE2 12 39 13 1 7 1 RTSB 13 38 12 5 BU2 B RxD B 14 37 11 3 VccE1 15 36 10 15 TxD B 16 35 9 2 CTSB 17 34 8 4 GndE1 18 33 7 1 7 RTSA 19 32 6 5 BU1 A RxD A 20 31 5 3 VccE1 21 30 4 15 TxD...

Page 31: ...GndE2 6 19 19 1 7 RTSC 7 18 18 5 BU3 C RxD C 8 17 17 3 VccE2 9 16 16 15 TxD C 10 15 15 2 CTSC 11 14 14 4 GndE2 12 13 13 1 7 1 RTSB 13 12 12 5 BU2 B RxD B 14 11 11 3 VccE1 15 10 10 15 TxD B 16 9 9 2 CTSB 17 8 8 4 GndE1 18 7 7 1 7 RTSA 19 6 6 5 BU1 A RxD A 20 5 5 3 VccE1 21 4 4 15 TxD A 22 3 3 2 CTSA 23 2 2 4 GndE1 24 1 1 1 7 Table 3 4 PB SIO4 to Carrier Board to AD SIO4 Pinout Table Both Positions ...

Page 32: ...PB SIO4 ID 19957 Rev 0300 Adapter AD SIO4 Page 4 1 PEP Modular Computers GmbH Adapter AD SIO4 4 1 Product Overview 4 3 4 2 Adapter Overview 4 3 Chapter 4 ...

Page 33: ... PEP Modular Computers GmbH This page was intentionally left blank ...

Page 34: ... connectors for internal connection to the PB SIO4 carrier board Connection from the carrier board to the adapter is done via a 50 way flat ribbon cable with a 50 pin dual row female connector for the carrier board and two 24 pin dual row female connectors for connection to the adapter This cable allows for the connection of two PB SIO4 s to two AD SIO4 s where pins 25 and 26 are not used See Tabl...

Page 35: ... another serial interface piggyback from PEP Note Always ensure that the correct connector of the adapter cable is connected to BU5 See Table 3 4 for cable pinout Note For use with the PB SIO4 ensure that there is no cable connected to BU6 Failure to comply with this will result in misfunctioning and possible damage to equipment RESERVED DO NOT USE USE FOR PB SIO4 see note below BU6 BU5 1 2 24 23 ...

Page 36: ...l service in house repair center WE BUY USED EQUIPMENT Sell your excess underutilized and idle used equipment We also offer credit for buy backs and trade ins www artisantg com WeBuyEquipment REMOTE INSPECTION Remotely inspect equipment before purchasing with our interactive website at www instraview com LOOKING FOR MORE INFORMATION Visit us on the web at www artisantg com for more information on ...

Reviews: