77420 - 38/107 -
10
.
Lead wires on bottom side
①
Solder 6 lands
②
Solder 6 lead wires
③
Solder 4 land
④
Arrange lead wires as shown in figure.
11. [Confirmation] Height of SR block base support pillar.
[Required equipment]: Block gauge for 35mm, Dial gauge comparator, etc. (same as K100D)
①
Measure height of 0-C000 base support pillar (3 places) from the mount surface as shown in the figure.
Tolerance (In common with 77310):
50.1+0.17/-0.13 mm
Using block gauge for 35mm (45.46mm):
+
4.51
〜
4.81 mm
+0.51 (+4)
〜
0.81 (+4)
+4
①
G100
(T72)
T940
(AF-SW)
S300
(T31)
②
③
DT(7x10)