Pentair PRF-RO Installation And Maintenance Manual Download Page 9

The table below shows the coding system for the fitting connections.  

Each fitting has a unique “keyed” socket on the manifold. Each 

fitting also has a graphic symbol molded into the elbow with a 

corresponding symbol on the manifold.

Connector Symbol

Connection

Tubing Color

`

Feed-Inlet

Natural

Concentrate

Black

*

Product 

Blue

WARNING:

 Be sure to lubricate the manifold ports with silicone 

lubricant, prior to inserting the fittings into manifold.

WARNING:

 Do not turn the incoming water valve on until the 

locking bar is in place.

When all of the connections have been made, use the locking bar to 

hold the fittings in position. Match the symbols on the locking bar to 

the corresponding symbols on the manifold (Figure 12).

Step 6:  System Startup

1.  Inspect all connections.
2.  Position manifold horizontal with openings facing up. 
3.  Remove new membrane elements from plastic packaging. 

The black and yellow tapes surrounding the membrane are 

an important part of the membrane element and should not be 

removed.

CAUTION: 

  Elements contain a foodgrade preservative. The use of 

sterile/latex gloves is recommended.

4.  Lubricate all O-ring seats in the manifold that come in contact 

with the sump and element O-rings. Refer to "Connection 

Lubrication" on page 8.

NOTE: To properly lubricate the O-ring contact area, a film of clean 

silicone grease is applied. The film should cover all of the 

surface area that the O-ring will slide over and seal with. Do 

not use grease containing petroleum products.

5.  Securely insert O-ring end of membrane elements into manifold.
6.  Remove prefilter from packaging. Check that gaskets are in place.
7.  Place prefilter in manifold.
8.  Replace sumps and tighten until it bottoms out.

Pressure Test System

To check for leaks, the system must be filled with water and brought 

up to operating pressure.
1.  Open cold water feed valve slowly. Run at 1/2 open for a minute, 

then open fully.

2.  Open faucet until water runs.
3.  Check for leaks.

NOTE: When the faucet is initially turned on, water may temporarily 

sputter from the air gap until the air is purged. Allow 1 to 3 

hours for any trapped air noise in the system to subside.

4.  Purge the system. Open the faucet and run the water through the 

RO system for two to eight hours.

NOTE: A minimum of  2 hour flush is required to remove the food 

grade preservative. After 8 hours performance will reach its 

stable maximum performance.

The RO system is now ready for use.

Symbols

INSTALLATION cont.

Figure 12   

9

Summary of Contents for PRF-RO

Page 1: ...properly rinse out the preservative The preservative is not harmful but makes the product water taste objectionable Rinsing the membrane also acts a performance conditioner All new membranes will reac...

Page 2: ...W TUBING INSTALL KIT PN 1255736 3 8 BLACK TUBING 4 ft 3 8 BLUE TUBING 4 ft 1 2 NATURAL TUBING 4 ft 1 2 RED TUBING 3 ft SILICONE LUBRICANT FEED DISCONNECT ELBOW WHITE PN 3035307 1 pc PERMEATE DISCONNEC...

Page 3: ...Coupling Install above P trap Locking Bar Keep to Minimum Prefilter RO Membrane Support Leg sump wrench Manifold Elbow Connectors Feed Pressure Gauge Drain Point A suitable drain point is needed for r...

Page 4: ...Air Gap Required Inlet 1 2 Natural Drain 3 8 Black Feed Water Valve Cold Water Line Only Carbon Postfilter Product 3 8 Blue RO Assembly Keep to Minimum THE BASIC REVERSE OSMOSIS SYSTEM cont Figure 3...

Page 5: ...Line Only Feed Pressure Gauge RO Assembly External Prefilter Product Storage Tank To Point of Use Vented to Atmosphere Liquid level float sensor to control feed solenoid valve Feed Solenoid Valve Figu...

Page 6: ...d that there is space underneath for tubing 2 If drilling is needed make a 1 1 2 inch diameter hole WARNING To avoid damaging a sink consult a qualified plumber or installer for the proper method of d...

Page 7: ...cure the connection NOTE When sliding tubing into the drain adapter inlet wet the tubing Water will help the tubing slide into the rubber inlet Feed Pressure Gauge The supplied pressure gauge can be c...

Page 8: ...ng instructions describe the method and locations for lubrication Six packets of silicone lube are supplied One packet should be completely used to lubricate the O ring contact surfaces in the 3 manif...

Page 9: ...eats in the manifold that come in contact with the sump and element O rings Refer to Connection Lubrication on page 8 NOTE To properly lubricate the O ring contact area a film of clean silicone grease...

Page 10: ...ening the faucet CAUTION Even with the water supply turned off the membrane and prefilter sumps will contain a considerable amount of water By positioning the RO assembly in a sink or tub most of the...

Page 11: ...ubing back approximately 1 4 inch prior to connecting the new postfilter Make sure flow direction arrow aligns with water path Reinsert tubing and collect locks 11 Re connect the fittings to the manif...

Page 12: ...78 C Inlet TDS 50 mg L 2 000 mg L Inlet Hardness 0 mg L 0 grain 171 mg L 10 grain Inlet Chlorine 0 mg L 1 0 mg L Inlet Iron 0 mg L 0 1 mg L Inlet Manganese 0 mg L 0 05 mg L Inlet pH 4 10 Inlet Turbidi...

Page 13: ...f flow into the postfilter is acceptable replace postfilter Leak or kink in product line Find and repair leak or kink Concentrate water runs to drain after faucet shut off Plugged prefilter Replace pl...

Page 14: ...14...

Page 15: ...15...

Page 16: ...2010 Pentair Residential Filtration LLC 4000413 Rev B JE10...