Hot and Cold water supply requirements

Electrical requirements

¾” supply lines with on/off valves NPT male threads. We recommend a ¾” ball valve with ¾” 

NPT male ports. (Valves supplied by others.) See figure 14-15

For optimum performance, dynamic pressures should be nominally equal between hot and 

cold supplies. 

Maximum static supply pressure: 145 PSI.

Maximum dynamic/maintained supply pressure: 81 PSI.

Maximum supply Hot water temperature: Consult local requirements for maximum allowed 

supply temperatures. (Not recommended over 120°F).

Figure 14-15

The Dream Spa is rated 10.5 Amps at 120 Volts AC.

A 15 amp GFCI circuit is required.

The Load Center is located on the back inside wall of the Dream tub. It is supplied with a 3 

foot electrical cord for a 120 V outlet. Please contact Penner Manufacturing, INC. for 

further options. Best location for power supply is through the rear skirt access door. Small 

cutouts through tub skirt as needed can allow for various electrical supply options. See 

figure 14-15.

It is recommended that the power wires be installed by an electrician. Then 

connect the Dream spa electrical cord.

Summary of Contents for Dream Spa 760010-1

Page 1: ...uctions 760010 1 760010 2 770010 1 770010 2 PENNER PATIENT CARE INC Box 523 101 Grant St Aurora NE 68818 760745 Revision A 10 2 2019 1 866 PENNERS 1 866 736 6377 1 800 732 0717 E mail Address pennersa...

Page 2: ...ls Basic Dimensions Rough in Specifications Drain Locations Hot and Cold Water Supply Requirements Electrical Requirements Unpacking the Tub Water Supply Hose Connections Anchoring the Tub Electrical...

Page 3: ...ols Meanings When the terms left or right are used with reference to the tub this means left or right as you look when seated in the tub Meaning Safety warning Failure to understand and obey this warn...

Page 4: ...a three speed blower motor First push of the air transmitter provides full speed and aeration of spa Second push is a medium level while a third push is the lowest setting for blower speed A fourth pu...

Page 5: ...5 Basic Measurements Figures 3 6...

Page 6: ...6 Rough in Specifications Figures 7 9...

Page 7: ...7 Figures 10 11 Figures 12 13 Drain Locations...

Page 8: ...ents for maximum allowed supply temperatures Not recommended over 120 F Figure 14 15 The Dream Spa is rated 10 5 Amps at 120 Volts AC A 15 amp GFCI circuit is required The Load Center is located on th...

Page 9: ...osite board do not need to be removed Reference Figure 16 2 Remove plastic cover and wrapping around spa 3 Locate and save installation components Ex anchor pins 4 Remove all access doors if applicabl...

Page 10: ...r coupler it may need to be in place loosely on the drain pipe prior to moving the tub into place 3 Carefully slide the tub into the desired position 4 There are two 5 16 x 2 anchor pins provided with...

Page 11: ...ort warm system will automatically turn off after 30 minutes Aqua Aire blower motor will automatically turn off after 20 minutes 11 Electrical Connections Water Supply and Drain Connections Note It is...

Page 12: ...and maintenance of the Dream Spa will significantly increase the life and usage of the spa Do Not attempt to operate this equipment before reviewing all the manuals and having proper professionals ins...

Reviews: