Anchoring the tub

This anchoring procedure describes the steps for anchoring the in both 

positions as shown in Figure 1 under “Dream Spa Introduction”.

1. Ensure that the electrical supply box has been wired properly. Also ensure that 

the provided supply lines have been connected to the supply valves. 

2. If the drain connection is to be made with a rubber coupler, it may need to be 

in place (loosely on the drain pipe) prior to moving the tub into place.

3. Carefully slide the tub into the desired position.

4. There are two 5/16 x 2” anchor pins provided with the tub. Drill a 5/16” hole 

through the base flange just inside the access door openings on either side of 

the spa towards the front. If the floor is something other than concrete, consult 

the building engineer for anchor selection. Another alternative is to place a 

sturdy board across both base flanges and bolt it to the floor, pinching the tub 

in place. 

Summary of Contents for Dream Spa 760010-1

Page 1: ...uctions 760010 1 760010 2 770010 1 770010 2 PENNER PATIENT CARE INC Box 523 101 Grant St Aurora NE 68818 760745 Revision A 10 2 2019 1 866 PENNERS 1 866 736 6377 1 800 732 0717 E mail Address pennersa...

Page 2: ...ls Basic Dimensions Rough in Specifications Drain Locations Hot and Cold Water Supply Requirements Electrical Requirements Unpacking the Tub Water Supply Hose Connections Anchoring the Tub Electrical...

Page 3: ...ols Meanings When the terms left or right are used with reference to the tub this means left or right as you look when seated in the tub Meaning Safety warning Failure to understand and obey this warn...

Page 4: ...a three speed blower motor First push of the air transmitter provides full speed and aeration of spa Second push is a medium level while a third push is the lowest setting for blower speed A fourth pu...

Page 5: ...5 Basic Measurements Figures 3 6...

Page 6: ...6 Rough in Specifications Figures 7 9...

Page 7: ...7 Figures 10 11 Figures 12 13 Drain Locations...

Page 8: ...ents for maximum allowed supply temperatures Not recommended over 120 F Figure 14 15 The Dream Spa is rated 10 5 Amps at 120 Volts AC A 15 amp GFCI circuit is required The Load Center is located on th...

Page 9: ...osite board do not need to be removed Reference Figure 16 2 Remove plastic cover and wrapping around spa 3 Locate and save installation components Ex anchor pins 4 Remove all access doors if applicabl...

Page 10: ...r coupler it may need to be in place loosely on the drain pipe prior to moving the tub into place 3 Carefully slide the tub into the desired position 4 There are two 5 16 x 2 anchor pins provided with...

Page 11: ...ort warm system will automatically turn off after 30 minutes Aqua Aire blower motor will automatically turn off after 20 minutes 11 Electrical Connections Water Supply and Drain Connections Note It is...

Page 12: ...and maintenance of the Dream Spa will significantly increase the life and usage of the spa Do Not attempt to operate this equipment before reviewing all the manuals and having proper professionals ins...

Reviews: