9
The blower motor sits on composite board. If drain,
water supply, or electrical hook up are in this area,
the board can be moved. Use a ½” wrench or socket
and ratchet to remove the hold down nuts. Lift the
board up and move to desired location while making
sure the blower motor delivery hose doesn’t kink.
Figure 16
Unpacking the Dream Spa
1. Remove cardboard around spa. Remove spa from pallet by unscrewing hold-
down boards from pallet. (Bower motor and composite board do not need to be
removed. Reference Figure 16)
2. Remove plastic cover and wrapping around spa.
3. Locate and save installation components. (Ex. anchor pins)
4. Remove all access doors (if applicable) and place them where they will not be
damaged during the installation process.
Water Supply Hose Connections
With an installation where the left side of the tub will be against a wall and the
water supply lines come from that wall, connect the hot and cold water lines to the
supply valves prior to moving the tub into place. The water lines uses a gasket to
make the seal. No thread tape or sealant is needed. The hose lines are female ¾”
NPT swivel ends.