
24
BOILER ExPLODED VIEW
Item
Description
Item
Description
Item
Description
1
Jacket Front Lower
13
Draft Hood
25
Pipe Nipple
2
Control
14
Restrictor
26
Pilot Spark Control
3
Jacket Front Upper
15
Jacket Back
27
Theraltimeter Gauge
4
Jacket Side Right
16
Right End Section
28
High Limit Control
5
Left End Section
17
Jacket Side Left
29
Pipe Bushing
6
Push Nipple
18
Relief Valve
30
Well
7
Jacket Top
19
Pipe Nipple
31
Tray
8
Damper
20
Pipe Elbow
32
Base
9
Baffle
21
Circulator
33
Burner Door
10
Center Section
22
Pipe Nipple
34
Gas Valve
11
Jacket Back To Flue
23
Pipe Tee
35
Manifold
12
Flue Collecter
24
Drain Cock
36
Burner Tube
Summary of Contents for 15B SERIES
Page 2: ......
Page 15: ...15 Wiring Diagram 24V Standing Pilot...
Page 16: ...16 Wiring Diagram 24V Intermittent Ignition...
Page 17: ...17 Wiring Diagram 24V Standing Pilot WITH LWCO...
Page 18: ...18 Wiring Diagram 24V INTERM IGNITION WITH LWCO...
Page 31: ...31...
Page 32: ...85 Middle Rd Dunkirk NY 14048...