
10
ZONE 3
ZONE 2
ZONE 1 (PRIORITY ZONE)
BOILER
ZONE 4
DHW CIRCULATOR
WATER INLET
CIRC 2
CIRC 3
CIRC 4
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
AIR SEPARATOR
ZONE VALVE
HOSE BIB
FLOW CONTROL
VALVE
EXPANSION
TANK
BOILER
DHW
CIRCULATOR
CH CIRCULATOR
PRIORITY ZONE
CIRCULATOR
EXPANSION
TANK
WATER INLET
FLOW CONTROL
VAVLE
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
AIR SEPARATOR
ZONE VALVE
HOSE BIB
SINGLE ZONE SYSTEM WITH
DHW PRIORITY
MULTIZONE SYSTEM WITH CIRCU-
LATORS AND DHW PRIORITY
CONNECTING SUPPLy AND RETURN PIPING
Figure #7
Figure #8
Summary of Contents for 15B SERIES
Page 2: ......
Page 15: ...15 Wiring Diagram 24V Standing Pilot...
Page 16: ...16 Wiring Diagram 24V Intermittent Ignition...
Page 17: ...17 Wiring Diagram 24V Standing Pilot WITH LWCO...
Page 18: ...18 Wiring Diagram 24V INTERM IGNITION WITH LWCO...
Page 31: ...31...
Page 32: ...85 Middle Rd Dunkirk NY 14048...