REPAIR PARTS
36
Table 11.2: Manifold/Gas Train (MI – Standing Pilot)
*For elevations over 2,000 feet above sea level contact PB Heat, LLC.
Item
No.
Description
Part Selection
Information
MI-03
MI-04
MI-05
MI-06
MI-07
MI-08
MI-09
5
Steel Burner
Specify quantity
51537
51537
51537
51537
51537
51537
51537
6
Steel Burner w/ Pilot Clip
1 per boiler
51263
51263
51263
51263
51263
51263
51263
7
Gas Manifold
50978 50979
50980
50981
50954
50955
50956
8
Orifice Spud, #48
Natural Gas, 0-2000 ft. (0-610 m)
elevation (specify qty)*
50894 50894
50894
50894
Orifice Spud, #49
Natural Gas, 0-2000 ft. (0-610 m)
elevation (specify qty)*
50895
50895 50895
Orifice Spud, #56
LP Gas, 0-2000 ft. (0-610 m)
elevation (specify qty)
50899
50899
50899
50899
Orifice Spud, #57
LP Gas, 0-2000 ft. (0-610 m)
elevation (specify qty)
50900
50900
50900
9
Honeywell VR8200A2116 Gas Valve
Natural Gas
50581
50581
50581
Honeywell VR8200C6040 Gas Valve
LP Gas
50221
50221
50221
Honeywell VR8300A4003 Gas Valve
Natural Gas
50587
50587
50587
50587
Honeywell VR8300C4035 Gas Valve
LP Gas
91333
91333
91333
91333
10
Honeywell Q314A3505 Pilot
Natural Gas
51688
51688
51688
51688
51688
51688
51688
Honeywell Q314A3703 Pilot
LP Gas
50555
50555
50555
50555
50555
50555
50555
11
Johnson K16BA-24D Thermocouple
50838
50838
50838
50838
50838
50838
50838
Figure 11.2:Manifold
Summary of Contents for MI-03
Page 1: ...MI MIH Boilers Series Gas Installation Operation Maintenance Manual ...
Page 21: ...19 Figure 6 4 Intermittent Ignition System Operating Sequence ELECTRICAL ...
Page 22: ...ELECTRICAL Figure 6 5 Zone Wiring with Zone Valves Figure 6 6 Zone Wiring with Circulators 20 ...
Page 25: ...23 START UP PROCEDURES Figure 7 4 Operating Instructions ...
Page 32: ...30 Figure 8 1 Intermittent Ignition System Troubleshooting Sequence TROUBLESHOOTING ...