6
BOILER SET-UP
1. Provide a sound, level foundation. Locate boiler as
near to the chimney or outside wall as possible and
centralized with respect to the heating system.
2. Locate boiler in front of installation position before
removing crate.
3. If using combustible floor pan, position pan on
foundation or flooring.
4. Separate the wood shipping pallet from the boiler
base by removing two (2) hold-down bolts at each
end of the boiler base.
5. Move boiler into final position. If using combustible
floor pan, install boiler on pan as outlined in the
instructions included with the pan.
2. BOILER SET-UP
Summary of Contents for MI-03
Page 1: ...MI MIH Boilers Series Gas Installation Operation Maintenance Manual ...
Page 21: ...19 Figure 6 4 Intermittent Ignition System Operating Sequence ELECTRICAL ...
Page 22: ...ELECTRICAL Figure 6 5 Zone Wiring with Zone Valves Figure 6 6 Zone Wiring with Circulators 20 ...
Page 25: ...23 START UP PROCEDURES Figure 7 4 Operating Instructions ...
Page 32: ...30 Figure 8 1 Intermittent Ignition System Troubleshooting Sequence TROUBLESHOOTING ...