9. Place the flexible sleeve over the cone stack and onto outlet assembly. Do not connect
to discharge at this time. The sleeve should be aligned such that the cable guides on the
sleeve are aligned with the lift cable attachment points on the outlet assembly.
10. Electrical connections can now be made to the drive motor, rotary limit switch, and
optional equipment. Refer to the provided wiring diagrams for more information.
a. If the pre-wire option has been purchased, all components on a sub-assembly, with
the exception of the motor and brake, are wired to a common junction box on the
sub-assembly. Components located on the outlet assembly are to be connected to
appropriate terminals in the junction box on the housing assembly. This is to be
done via the multiple-conductor cable festoon on the flexible sleeve or the cable reel
provided for this purpose. All other control terminations are made in the junction box
located on the housing assembly.
b. If the pre-wire option has not been purchased, the customer or his representative is
responsible for terminations at the various components, according to the drawing
provided. Connections for the tilt switch are located within a small terminal box
located on the outlet assembly. The rotary limit switch and slack cable limit switch
are located on the housing assembly, and should be wired through conduit suitable
for the expected environment. The motor and brake should be wired through a
separate conduit, as these are high-voltage, three-phase components.
11. Check the motor for correct rotation.
!!! WARNING !!!
Until the Rotary Limit Switch has been checked to
ensure proper adjustment, DO NOT FULLY
RETRACT THE SPOUT, as over retracting may
cause damage to the unit.
12. Lower the lift cables a minimum of 6 inches past
the attachment points on the outlet assembly,
threading each cable as seen in
: (a)
through the slack cable limit switch arm (if
provided), and (b) through the cable guides on the
flexible sleeve.
13. Attach the lift cables to the outlet assembly using
the lifting eyebolts, making necessary
adjustments to ensure the discharge will hang
level.
14. Continue to
Section 6.7
adjustment before proceeding to step 15.
15. Using the drive assembly, raise the outlet
assembly until the cone support cable harness
can be connected to the housing assembly using
the quick-links provided. Lower the discharge to