PCB Piezotronics M1204-13A Installation And Operating Manual Download Page 14

 

PCB Load & Torque, Inc.   

 Toll-Free in USA 866-684-7107   

 716-684-0001   

 www.pcbloadtorque.com

 

 

 

GENERAL PURPOSE LOW PROFILE LOAD CELL OPERATION MANUAL 

 

8

 

are  not  allowed  to  migrate  into  devices  that  are  not 
hermetically sealed.  Such devices should only be wiped with 
a damp cloth, and never be submerged or have liquids poured 
on them.  Never use a pressure washer on the load cells. 
 
General purpose low profile load cells,  when  mounted on the 
factory  supplied  base,  are  barometric  compensated  through  a 
small  port  located  in  one  of  the  spanner  wrench  holes  on  the 
base. 
 
The  bolts  used  to  install  bases  at  the  factory  have  been 
tightened  to  specifications  to  prevent  loosening  under  normal 
usage.  However, if the base has been removed for any reason, 
or the load cell has been mounted on a custom fixture without 
the base, it is a good idea to periodically test the mounting bolt 
tightness using a calibrated torque or click wrench. 
 
 

11.0 TROUBLE SHOOTING 

 
Proper performance of a load cell requires careful attention to 
both electrical and mechanical aspects of the measurement 
system.  A basic understanding of the electrical and 
mechanical installation requirements is recommended. 

11.1 Mechanical Trouble Shooting 

A mechanical checklist includes: 
 

1.

 

Check for proper installation of load cell. 
 

2.

 

Check for properly tightened bolts. 

11.2 Electrical Trouble Shooting 

An electrical checklist should start with: 
 

1.

 

Check cables for proper wiring. 

 
2.

 

Inspect for loose or dirty electrical connections. 

 
3.

 

Check for improper shield grounds. 

 
4.

 

Check  for  proper  grounding  of  the  structure  that  the 
load cell is mounted on. 

 
5.

 

Check  the  signal  conditioning  electronics  for  proper 
setup. 

 
6.

 

Check 

the 

insulation 

resistance 

of 

shielded 

conductors for short circuits. 

 
7.

 

Check  isolation  resistance,  load  cell  flexure  to 
conductors. 

 
8.

 

Check  load  cell  bridge  resistances,  (A-D)  excitation 
and (B-C) the signal leads. 

 

9.

 

Check bridge balance. 

 
10.

 

Keep a record of your observations, correct problems, 
or contact PCB factory for assistance. 

11.2.1 Estimating Bridge Balance using an Ohm Meter 

 
A  load  cell  that  has  been  severely  overloaded  will  exhibit  a 
significant  zero  offset  in  the  Wheatstone  bridge.    It  can  be 
useful  to  estimate  the  bridge  unbalance  using  a  digital  ohm 
meter with resolution of at least 0.1 ohm. 
 
Following  the  Western  Region  wiring  diagram  measure  the 
resistances for each leg of the bridge, i.e.:  R

AB

, R

AC

, R

DB

, and 

R

DC

 
 
 
 
 
 
 
 
 
 
 
 

1.

 

Estimate the Zero Offset (mV/V): 

 

Zero Offset = 1.4 x (R

AC

 - R

AB

 + R

DB

 - R

CD

)  

 

2.

 

Estimate the Bridge Unbalance (% Full Scale): 

 

Bridge Unbalance = 100 x (Zero Offset / Output

FS

Where: 

Output

FS

 = Full Scale output of the load cell (mV/V) 

 
A Zero Offset of greater than 10% indicates probable overload 
or  possible  fatigue  damage.    A  load  cell  that  has  been 
significantly overloaded enough to create a large zero offset is 
not  repairable.  In  some  instances  it  may  be  possible  to 
temporarily  continue  to  use  the  load  cell  by  attempting  to 
balance the bridge through use of external resistors. However, 
the user should expect that such a load cell no longer will meet 
the 

performance 

parameters 

related 

to 

its 

original 

specifications. (User beware!!) 

 

12.0 CALIBRATION / REPAIR SERVICES 

 
PCB  Load  &  Torque  offers  calibration  and  repair  services. 
The  PCB  Calibration  Laboratory  in  Farmington  Hills, 
Michigan is A2LA Accredited per ISO/IEC 17025. 
 
 

 

R

DB

 

R

CD

 

R

AB

 

R

AC

 

Figure 17

 

– Wheatstone Bridge 

Summary of Contents for M1204-13A

Page 1: ...oad cell Installation and Operating Manual For assistance with the operation of this product contact PCB Piezotronics Inc Toll free 800 828 8840 24 hour SensorLine 716 684 0001 Fax 716 684 0987 E mail...

Page 2: ...repair User servicing or repair is not recommended and if attempted may void the factory warranty Calibration Routine calibration of sensors and associated instrumentation is recommended as this helps...

Page 3: ...ry customer service representative Warranty All equipment and repair services provided by PCB Piezotronics Inc are covered by a limited warranty against defective material and workmanship for a period...

Page 4: ...isclosure Table Pb Hg Cd Cr VI PBB PBDE O O O O O O PCB X O O O O O O O O O O O X O O O O O O O O O O O O O O O O O O O O O O O O O X O O O O O O O O O X O O O O O O O O O O O X O O O O O X O O O O O...

Page 5: ...e O O X O O O Wires O O O O O O Cables X O O O O O Plastic O O O O O O Solder X O O O O O Copper Alloy Brass X O O O O O This table is prepared in accordance with the provisions of SJ T 11364 O Indica...

Page 6: ...nted Steel Sensing Element Strain Gage Strain Gage Mounting Torque 1400 lbf in 158 Nm Deflection at Full Scale Capacity 0 002 in 0 05 mm Electrical Connector PT02E 10 6P PT02E 10 6P All specifications...

Page 7: ...4 5 0 ELECTRICAL INSTALLATION 5 5 1 Electrical Drawing Western Regional Std 5 5 2 Cable Grounding Considerations 5 6 0 CALIBRATION 5 6 1 Calibration Certificate Description 5 6 1 1 Measured Output 6...

Page 8: ...evaluated for potential failure modes of the fixtures It is important to use threaded fasteners properly when assembling test fixtures used with the load cells Fixtures with inadequately designed bol...

Page 9: ...modified 4 2 Mounting Load Cell to a Standard Base or Custom Fixture If the load cell is to be mounted to a custom base or fixture it is necessary to consider the following 1 The thickness of the new...

Page 10: ...f Connector Protector 1 Remove the 4 40 x 1 4 button head cap screws from the connector using a 1 16 hex wrench as shown in Figure 7 2 Carefully pull the connector from the load cell Take care to not...

Page 11: ...A simple test with a voltmeter connected between the power cord ground and the structure on which the load cell is mounted can confirm that the structure has been properly grounded If the power cord g...

Page 12: ...into the load cell structure The strain gage bridges on general purpose low profile load cells are adjusted such that the error due to eccentric loading is less than 0 25 per inch of offset for 1200 s...

Page 13: ...s on the load cell If possible remove all loads 2 Power up the host signal conditioner and connect it to the load cell via appropriate cable and allow for a 30 minute warm up 3 Set the load indicator...

Page 14: ...e load cell is mounted on 5 Check the signal conditioning electronics for proper setup 6 Check the insulation resistance of shielded conductors for short circuits 7 Check isolation resistance load cel...

Page 15: ...der Please request a return material authorization RMA before sending a load cell back to the factory for any reason For calibration services if possible a copy of the purchase order covering the requ...

Reviews: