PCB Piezotronics M1204-13A Installation And Operating Manual Download Page 10

 

PCB Load & Torque, Inc.   

 Toll-Free in USA 866-684-7107   

 716-684-0001   

 www.pcbloadtorque.com

 

 

 

GENERAL PURPOSE LOW PROFILE LOAD CELL OPERATION MANUAL 

 

4

 

 
 
 
 
 
 
 

4.3 Threaded Tension Rods 

NOTE:  Threaded  tension  rods  are  an  optional  feature  on  the 

low profile load cell.   

 
Installation  of  the  load  cell 
starts  with  tension  pre-loading 
the  load  cell  to  120-150%  of 
full  scale  capacity  and  lightly 
tightening  a  jam  nut  to  lock  in 
the preload on both the load cell 
and base tension rods. Once the 
preload  tension  is  released,  the 
threads 

will 

be 

securely 

engaged. 
 
 Failure 

to 

pre-load 

the 

attachment  rods/  fixtures  can 
result  in  damage  to  the  threads 
on the load cell and base during 
cyclic load tests. 
 
Threaded  rods  engaging  the  load  cell  should  have  Class  3 
threads to ensure thread-to-thread close contact forces. 
 
NOTE:  It  is  important  that  the  tension  rods  installed  in  the 

load cell and base use full thread engagement, but are 
not  jammed,  or  torqued.    They  should  be  ½-1  turn 
from  the  bottom  of  the  threads  in  both  the  base  and 
load cell. 

 

4.4 Mounting Optional Connector Protectors 

Models  1203,  1403,  1204,  and  1404  general  purpose  low 
profile  load  cells  do  not  come  standard  with  connector 
protectors.  If optional connector protectors are to be mounted, 
it is necessary to consider the following: 

4.4.1 Included Components in Kit (084A90) 

 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 

4.4.2 Required Tools 

 
 
 
 
 
 

4.4.3 Installation of Connector Protector 

 

1.

 

Remove the #4-40 x 1/4” button head cap screws 
from the connector using a 1/16” hex wrench as 
shown in Figure 7. 

 

2.

 

Carefully pull the connector from the load cell.  Take 
care to not break or loosen any wire connections. 

 

3.

 

Slide the connector protector (54823-02) behind the 
connector as shown in Figure 8. 

 

4.

 

Apply a drop Loctite® Threadlocker Blue 242® to 
the threads of the #4-40 x 3/8” socket head cap 
screws.  

 
NOTE:  Please refer to the Loctite® Threadlocker Blue 242® 

technical data sheet for directions of use. 

 

5.

 

Attach the connector protector (54823-02) to the load 
cell with the #4-40 x 3/8” socket head cap screws 
using a 3/32” hex wrench as shown in Figures 9 and 
10. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Bolt Size 

Part Number 

 Installation Torque 

1/4-28x1 3/4

 

100-8011-10 

15-17 LbFt (180-204 LbIn) 

3/8-24x2 1/4

 

100-8082-20 

75-80 LbFt (900-960 LbIn) 

1/2-20x3 1/2

 

100-8011-30 

120-130 LbFt (1440-1560 LbIn) 

3/4-16x4 1/2

 

100-10026-40 

370-400 LbFt (4440-4800 LbIn) 

 

Table 4

 

– Tension Base Installation Torque Values 

 

Jam Nut 

Preload (120-150% FS) 

Pre-Tension 

Stud w/3B 

Threads 

Jam Nut 

Pre-Tension 

Stud w/3B 

Threads 

Preload (120-150% FS) 

Figure 4

 

– Installation of Pre-

Tension Studs 

Table 5 - Kit Components 

 

Component 

Quantity 

Connector Protector (54823-02) 

#4-40 x 3/8” Socket Head Cap Screw 

 

Figure 5 - Connector 

Protector (54823-02) 

Figure 6 - #4-40 x 3/8” 

Socket Head Cap Screw 

Table 6—Required Tools (Not Included) 

 

1/16” Hex Wrench 

3/32” Hex Wrench 

Loctite® Threadlocker Blue 242® 

 

Figure 7 - Remove the #4-40 x 1/4” 

Button Head Cap Screws 

Figure 8 - Slide the Connector 

Protector (54823-02) Behind the 

Connector 

 

 

 

 

Summary of Contents for M1204-13A

Page 1: ...oad cell Installation and Operating Manual For assistance with the operation of this product contact PCB Piezotronics Inc Toll free 800 828 8840 24 hour SensorLine 716 684 0001 Fax 716 684 0987 E mail...

Page 2: ...repair User servicing or repair is not recommended and if attempted may void the factory warranty Calibration Routine calibration of sensors and associated instrumentation is recommended as this helps...

Page 3: ...ry customer service representative Warranty All equipment and repair services provided by PCB Piezotronics Inc are covered by a limited warranty against defective material and workmanship for a period...

Page 4: ...isclosure Table Pb Hg Cd Cr VI PBB PBDE O O O O O O PCB X O O O O O O O O O O O X O O O O O O O O O O O O O O O O O O O O O O O O O X O O O O O O O O O X O O O O O O O O O O O X O O O O O X O O O O O...

Page 5: ...e O O X O O O Wires O O O O O O Cables X O O O O O Plastic O O O O O O Solder X O O O O O Copper Alloy Brass X O O O O O This table is prepared in accordance with the provisions of SJ T 11364 O Indica...

Page 6: ...nted Steel Sensing Element Strain Gage Strain Gage Mounting Torque 1400 lbf in 158 Nm Deflection at Full Scale Capacity 0 002 in 0 05 mm Electrical Connector PT02E 10 6P PT02E 10 6P All specifications...

Page 7: ...4 5 0 ELECTRICAL INSTALLATION 5 5 1 Electrical Drawing Western Regional Std 5 5 2 Cable Grounding Considerations 5 6 0 CALIBRATION 5 6 1 Calibration Certificate Description 5 6 1 1 Measured Output 6...

Page 8: ...evaluated for potential failure modes of the fixtures It is important to use threaded fasteners properly when assembling test fixtures used with the load cells Fixtures with inadequately designed bol...

Page 9: ...modified 4 2 Mounting Load Cell to a Standard Base or Custom Fixture If the load cell is to be mounted to a custom base or fixture it is necessary to consider the following 1 The thickness of the new...

Page 10: ...f Connector Protector 1 Remove the 4 40 x 1 4 button head cap screws from the connector using a 1 16 hex wrench as shown in Figure 7 2 Carefully pull the connector from the load cell Take care to not...

Page 11: ...A simple test with a voltmeter connected between the power cord ground and the structure on which the load cell is mounted can confirm that the structure has been properly grounded If the power cord g...

Page 12: ...into the load cell structure The strain gage bridges on general purpose low profile load cells are adjusted such that the error due to eccentric loading is less than 0 25 per inch of offset for 1200 s...

Page 13: ...s on the load cell If possible remove all loads 2 Power up the host signal conditioner and connect it to the load cell via appropriate cable and allow for a 30 minute warm up 3 Set the load indicator...

Page 14: ...e load cell is mounted on 5 Check the signal conditioning electronics for proper setup 6 Check the insulation resistance of shielded conductors for short circuits 7 Check isolation resistance load cel...

Page 15: ...der Please request a return material authorization RMA before sending a load cell back to the factory for any reason For calibration services if possible a copy of the purchase order covering the requ...

Reviews: