Standard Stud Mount Procedure 

This mounting technique requires smooth, flat contact surfaces for proper operation and is recommended for 

permanent and/or secure installations. Stud mounting is also recommended when testing at high frequencies. 

Note:

 DO NOT attempt mounting on curved, rough or uneven sufaces, as the potential for misalignmen and 

limited contact surface may significantly reduce the senor

’s upeer operating frequnecy range.  

 

Figure 6

– direct adhesive mounting 

1/4-28 stud            1/4-28 Captive Screw-*                       

 

A (in)                      0.250                0.250                            

B (in)                      0.350                0.350                            

Torque (ft-lb)         2 to 5                 2 to 5                         

 

STEP 1

 First, prepare a smooth, flat mounting surface, and then drill and tap a mounting hole in the center of this 

area as shown in Figure 6. A precision-machines mounting surface with a minimum finish of 63 µin [0.0016 mm] is 

recommended. (If it is not possible to properly prepare the machine surface, consider using an adhesive mounting 

pad as a possible alternative.) Inspect the area, checking that there are no burrs or other foreign particles 

interfering with the contact surface. 

 

STEP 2 

Wipe clean the mounting surface and spread on a light film of grease, oil or similar coupling fluid prior to 

installation. 

Figure 7

– mounting surface lubrication. 

 

Adding a coupling fluid improves vibration transmissibiliy by filling small voids in the mounting surface and 

increasing the mounting stiffness. For semi-ermanent mounting, substitue epoxy or another type of adhesvie. 

 

STEP 3 HAND 

 tighten the sensor/mounting stud to the machine, then secure the sensor with a torque wrench 

to the mounting surface by applying the recommended mounting torue ( see enclosed specification data sheet for 

proper mounting torque). It is important to use a toque wrench during this step. 

Under-toruing the sensor may 

not adequately couple the device; over-torquing may result in stud failure and possible permanent 

damage. 

Summary of Contents for IMI SENSORS 640B11

Page 1: ...Sensor Installation and Operating Manual For assistance with the operation of this product contact PCB Piezotronics Inc Toll free 800 959 4464 24 hour SensorLine 716 684 0001 Fax 716 684 3823 E mail...

Page 2: ...alized tests including sensitivity at elevated or cryogenic temperatures phase response extended high or low frequency response extended range leak testing hydrostatic pressure testing and others For...

Page 3: ...tion on particular operating steps The following symbols may be found on the equipment described in this manual This symbol on the unit indicates that high voltage may be present Use standard safety p...

Page 4: ...China RoHS 2 Disclosure Table Pb Hg Cd Cr VI PBB PBDE O O O O O O PCB X O O O O O O O O O O O X O O O O O O O O O O O O O O O O O O O O O O O O O X O O O O O O O O O X O O O O O O O O O O O X O O O O...

Page 5: ...O Wires O O O O O O Cables X O O O O O Plastic O O O O O O Solder X O O O O O Copper Alloy Brass X O O O O O This table is prepared in accordance with the provisions of SJ T 11364 O Indicates that sai...

Page 6: ...trial 4 20mA Sensor Operating Guide with Enclosed Warranty Information 3425 Walden Avenue Depew New York 14043 2495 Phone 716 684 0003 Fax 716 684 3823 Toll Free Line 1 800 959 4IMI MANUAL NUMBER 2531...

Page 7: ...n and Wiring Page 5 Standard Wiring Taking Measurements RV Option RVVO Option TO Option Installation Page 9 Direct Adhesive Mount Standard Stud Mount Adhesive Stud Mount Magnetic Mount ESD Sensitivity...

Page 8: ...further details General Features Imbedded Piezoelectric Accelerometer for improved accuracy and frequency response Vibration range can be in Acceleration or Velocity Allows for continuous vibration m...

Page 9: ...PAGE 4 Dimension Drawing...

Page 10: ...ply to Pin B or Blue Wire of the sensor Figure 1 wiring loop powered Figure 2 wiring loop powered DC source If using a standard DC power supply install either an ammeter and or load resistor in line w...

Page 11: ...pk 12 0 0 25 ips pk 0 5 ips pk 1 0 ips pk 15 75 0 37 ips pk 0 73 ips pk 1 47 ips pk 20 0 5 ips pk 1 0 ips pk 2 0 ips pk Measured mA 641BX0 641BX1 641BX2 4 00 0 0 ips rms 0 0 ips rms 0 0 ips rms 8 00 0...

Page 12: ...option which integrates the signal to a value of 100 mV IPS 20 Figure 3 RV and RVVO wiring For integral cable sensors RED 4 20mA Positive BLACK 4 20mA Negative same as green GREEN RV and RVVO negativ...

Page 13: ...e environment internal to the sensor housing and is situated at approximately mid level Figure 4 TO wiring For integral cable sensors RED 4 20mA Vibration Positive BLACK 4 20mA Vibration Negative GREE...

Page 14: ...e 645 646 series because of the increased frequency response Direct Adhesive Mount Procedure For restrictions of space or for convenience most sensors with the exception of integral stud models can be...

Page 15: ...to properly prepare the machine surface consider using an adhesive mounting pad as a possible alternative Inspect the area checking that there are no burrs or other foreign particles interfering with...

Page 16: ...requency response This method involves attaching a base to the machine surface then securing the snesor to the base This alows for easy removal of the accelerometer STEP 1 Prepare a smooth flat mounti...

Page 17: ...adhere a stell mounting pad to the test surface This provides a smooth and repeatable location for mounting Figure 9 magnet types STEP 1 After choosing the correct magnet type inspect the unit verifyi...

Page 18: ...rical devices Similar to a capacitor a cable can hold a charge caused by triboelectric transfer such as that which occurs in the following Laying on and moving across a rug Any movement through air Th...

Page 19: ...ATION RMA NUMBER Please have information available such as model and serial number Also to insure efficient service provide a written description of the symptoms and problems with the equipment to a l...

Page 20: ......

Page 21: ......

Reviews: