PBI 86666 Instruction Manual Download Page 6

International pbi S.p.A   

Instruction Manual  

29/08/05              Rev. 1

 

6

5. INSTALLATION  

 

Anemometer installation  
1. Screw the  impeller anemometer (a) on top of  the aluminium vertical wind tunnel. 
Flow sensor installation 
2. Fix the   flow sensor with LCD display (b) on side of the aluminium vertical wind tunnel. 
Vertical wind tunnel installation 
3. The battery pack of the “SAS” air sampler instrument to be checked must be charged for at least 14 hours before the 
test (3.5 hours if fast battery charger is used).   
4. The “SAS” air sampler should be positioned in vertical position in a quiet place on a strong surface. Avoid current of 
air around the instrument. 
5. Program 1000 litres of air on the “SAS” air sampler and switch it on. 
6. Position the “Pyramid” system (c) on top of the SAS air sampler. 
7. Switch on the “Pyramid” system by briefly pressing the switch button of the flow sensor. The software version will 
appear on the LCD display first, after which the instrument moves into the mode for measuring the current air flow 
(litres per minute or cubic feet per minute). The measuring time is approximately 30 seconds to obtain a stable data 
reading. 
Unit of measurement choice 
8. The LCD display switches to the converse version (L/minute or cubic meter per minute) by repeated pressing of the 
push button. 
Switch off of the unit 
9. Hold the push button pressed down until the unit switches off. 

 
 
 
 
 

 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

                                                                   
 
 

Summary of Contents for 86666

Page 1: ...PYRAMID Flowcheck System Code n 86666 I IN NS ST TR RU UC CT TI IO ON N M MA AN NU UA AL L International PBI S p A Via Novara 89 20153 Milano Italy Tel 39 02 48779 1 Fax 39 02 40090010 International...

Page 2: ...y grounded three prong wall outlet Warning Fire or electric shock hazard do not expose this product to rain or moisture This unit contains dangerous voltages NEVER remove cover unless qualified to do...

Page 3: ...al 29 08 05 Rev 1 3 INDEX 1 Introduction pg 4 2 Technical specification pg 4 3 Component of the Pyramid system pg 5 4 Preliminary inspection pg 5 5 Installation pg 6 6 Operations pg 7 7 Maintenance pg...

Page 4: ...xact air flow that is passing through the fan The Pyramid flowcheck system can display the airflow either in litres per minutes L or cubic feet per minute CF The precision of the measured value is for...

Page 5: ...ded that this scientific system is treated with care and attention in order to maintain its precision 4 PRELIMINARY INSPECTION 4 The apparatus is subject to specific working tests before shipping and...

Page 6: ...ong surface Avoid current of air around the instrument 5 Program 1000 litres of air on the SAS air sampler and switch it on 6 Position the Pyramid system c on top of the SAS air sampler 7 Switch on th...

Page 7: ...ded that the system is carefully treated The system doesn t require special care and maintenance procedure Clean the outside surface with a normal cloth Do not subject the system to sudden shock Batte...

Page 8: ...EN KUNDEN F r Benutzer unserer Apparate sind alle ersatzteilen die sich aus mechanischen Fehlern in normalen Gerbrauch ergeben f r zen Monate garantiert Damit wir Ihnen einem erstklassigen Service die...

Page 9: ...TROL DATE INSTRUMENT MODEL DATE OF LAST CONTROL AVERAGE VALUE OF THE LAST CONTROL 55mm CONTACT PLATE RODAC 84mm CONTACT PLATE 90mm PETRI DISH TEST N 1 2 3 4 5 6 7 8 9 10 LTS MN TEMPERATURE LOCATION AV...

Page 10: ...KED TO THE EXPORT DPT Company Address City Zip Code State Phone Fax Email Name to contact Lab Division return request of technical service Equipment Model Serial Number for calibration repair other sp...

Page 11: ...International pbi S p A Instruction Manual 29 08 05 Rev 1 11...

Page 12: ...153 Milano HEREBY DECLARES under its sole responsibility that the following product PYRAMID Flowcheck System Art 86666 conforms with the technical requirements of the following directives 89 336 CEE 9...

Reviews: