3 Product description
2017/11
99360453x-mub-en – V04
11
Proceeding:
1.
Take off the thermometer handles
(A-2, F-2) and remove the insulating
front shell.
2.
Take the group of fittings out of the
insulating back shell.
3.
Dismount the mixing valve (C)
and assemble it as described in the
instructions of the conversion kit.
4.
Interchange the return pipe (D)
and the pump (B).
Consider the flow direction of the pump!
Turn the pump head such that the
terminal box is directed to the top or
to the centre of the group of fittings.
5.
Dismount and interchange the ball valves.
6.
Mount the HeatBloC and connect it to the
installation.
7.
Check all union nuts before
commissioning and firmly
tighten them if necessary.
8.
Carry out a pressure test.
9.
Mount the insulation and the
thermometer handles (A-2, F-2)