22
9. Connect it to the terminal points provided for that purpose according to Tab. 6.
Fig 28: control system casing with control board
G
Terminal X0 control board
Signal
X0.01 +12
V
X0.02 U
s
(control voltage supply air fan)
X0.03 U
e
(control voltage exhaust air fan)
X0.04 GND
Tab. 6: Terminal assignment terminal X0 control board
10. Remount the control system casing in reverse order. Introduce the press-in keyhole fasteners of the control
system casing into the keyholes
E
.
Fig 29: Establishment of the keyhole connection
11. Place the cables into the free space between the control system casing and the EPP modules.
Make sure that no cables get jammed under the control system casing!
12. By turning the locking screws
D
in the press nuts clockwise, the control system casing is fixed by the press-in
keyhole fasteners latching into the restriction of the keyholes. During this process, the press-in keyhole
fasteners and, in consequence, the control system casing are shifted by approx. 3 - 5 mm in the direction of
the arrow.
E
G