Introduction
25
SmartNode 4400 Series Getting Started Guide
3 • Hardware installation
Introduction
This chapter contains information for planning the installation of the SmartNode 4400 IpChannel Bank with
the following installation procedures:
•
Section
“Unpacking the Model SN4400 series IpChannel Bank”
on page 28 lists the contents of the ship-
ping box
•
Section
“IpChannel Bank chassis installation”
on page 28 describes installing the IpChannel Bank on a flat
surface or in a 19-inch rack
•
Section
“Connecting cables”
on page 29 describes installing the power and port cables
•
Section
“Connecting power”
on page 31 describes how to verify that the IpChannel Bank is ready for con-
figuration
Planning the installation
Before beginning the actual installation, we strongly recommend that you gather all the information you will
need to install and set up the device. See
table 4
for an example of installment checklist that may be necessary
for a smoother installation. Completing the pre-installation checks enables you to install and set up your
IpChannel Bank within an existing network infrastructure with confidence.
Before installing the IpChannel Bank device, the following tasks should be completed:
•
Prepare an installation checklist
using the list provided in section
“Installation checklist”
on page 26
•
Initiate and mantain a site log
using the information in section
“Site log”
on page 26
as a guide
•
Create a network diagram
(see section
“Network information”
on page 27)
•
Gather IP related information
(see section
“IP related information”
on page 27 for more information)
•
Install the hardware and software needed to configure the SmartNode
. (See section
“Configuration tools”
on page 27)
•
Verify power source reliability
(see section
“Power source”
on page 27).
When you finish preparing for your VoIP installation, go to section
“Installing the IpChannel Bank”
on
page 28 to install the device.
Summary of Contents for SmartNode 4400
Page 7: ...7 SmartNode 4400 Series Getting Started Guide Table of Contents Introduction 71...
Page 63: ...63 Appendix D Factory Configuration Chapter contents Introduction 63...
Page 68: ...68 Appendix F Installation checklist Chapter contents Introduction 68...
Page 70: ...70 Appendix G Accessories Chapter contents Introduction 70...