![pathway 307183 Manual Download Page 8](http://html.mh-extra.com/html/pathway/307183/307183_manual_762157008.webp)
MODEL 7183 DUAL CHANNEL BJ80 BNC A/B/OFFLINE SWITCH WITH SECURE EHTERNET REMOTE
Electro Standards Laboratories, Inc.
(401) 943-1164
www.electrostandards.com - pg 7 - Pub. 5847-01
INSTALLATION
This section describes the physical connections required to start
operating the Model 7183.
Figure 1: Model 7183 Rear Panel
The rear panel view of the switch is shown in the above figure. On the
rear of the switch are the following ports:
•
POWER
– Phoenix (F), External Power Supply Input connector.
•
REMOTE
– RJ45 (F), 10/100BASE-T LAN access Ethernet
Remote Control port.
•
RESET
– Reset button for the 10/100Base-T LAN access
Ethernet port.
•
COM
– BJ80 BNC (F), the “COMMON” or shared device port fro
each channel.
•
A
– BJ80 BNC (F), the “A” device port for each channel.
•
B
– BJ80 BNC (F), the “B” device port for each channel.
Power Supply
After all the proper connections have been made, plug the Model 7183
into a 100VAC/240VAC, 50Hz/60Hz wall receptacle using the supplied
12VDC, 500mA, UL listed and LPS approved, 2-prong US non-polarized
NEMA 1-15P plug wall mount power supply, P/N 516682.
Option: Wide Range Power Module, (Cat. No. 517277),
100VAC/240VAC, 50Hz/60Hz, IEC 60320 C14 inlet, can be ordered for
use in place of the standard NEMA 1-15P plug power module that is
included with the unit. Ideal for international applications.
Upon power up the Model 7183 will process its power up routine. When
the routine is done the front panel LED's will indicate the present
position of the unit. At this point the unit is ready for operation.
Power
A, B, and COM ports
Remote
Model 7183 Rear Panel
Reset