
38
Unit Setup
...VRT Options
VRT Test
This option is used to ensure that
there is communications between
the BlackBox and the Controller
before starting a variable rate job.
It is recommended that the test is
done with the implement empty.
Connect the BlackBox to the Controller as described on page 19.
Before starting the test ensure the controller box is powered up and ready to
receive data from the unit (some controllers require the implement to be in full
working mode with the vehicle moving). When ready press
Test
to begin and the
Rate
will start counting up 100, 200, 300 up to 1000, check to ensure that the
controller is also counting in sequence (May not be in sync because of a delay in
the data transmission).
If the test is unsuccessful, turn off the controller and the Blackbox and check all
connections. Power up the BlackBox, once loaded press Start BlackBox and go
to Setup > VRT Options > VRT Test. Next power up the controller and when
ready run the test again.
If the test is successful press
Finished
to return to the VRT Options menu.
Summary of Contents for BlackBox 510
Page 2: ......