Parkside PSZ 250 B2 Operation And Safety Notes Download Page 12

8

GB

Safety notices specific to the device / Before using / Operation

Before beginning, verify the steel cable 

6

 is

wound around the drum 

3

 correctly and the

clearance between the turns is smaller than the

steel cable (Fig. B).

Secure the cable hoist to a square pipe / boom
using the 2 mounting brackets 

1

 .The dimensi-

ons of the square pipe / boom must correspond 
with the size of the mounting bracket 

1

 and

must be able to bear double the rated load.

Note:

 We recommend contact a qualified

technician for this purpose.
Screw the mounting brackets 

1

 to the cable

hoist (also see Fig. C).

Tighten all screws.

Note:

 A qualified technician should inspect

the anchor of the square tube / boom before

putting the device into service.

Note:

 The cable hoist motor 

14

 is equipped

with a thermostat switch. The motor 

14

 may 

therefore stop whilst operating the cable hoist; 

it will automatically restart once it has cooled 

down.

The user must hoist the load from the ground at

the slowest possible speed. The cable must be

tightened when the load is being hoisted.

Secure the device with a 10 A fuse or a 10 A

earth leakage circuit breaker to protect the

electric circuit.
Before beginning, verify the steel cable 

6

 is

wound around the drum 

3

 correctly and the

clearance between the turns is smaller than the

steel cable (Fig. B).

Remove the adhesive tape from the cable drum

3

 prior to first use.

Ensure the load is properly secured to the hook

8

 or, for pulley operation, the additional hook

16

 , and always maintain a distance to the

load and the steel cable 

6

 .

Check if the emergency stop switch 

9

 is

pressed.
Turn the emergency stop switch 

9

 clockwise

to release.
Press the push button

 

10

 to hoist the load

(see Fig. H).
Press the push button

 

10

 to lower the load

(see Fig. H).

Auto-stop mechanism lever 

5

 

When the maximum hoisting height has been 
reached, the shut-off weight 

7

 will push the lever 

5

 upward. This engages a limit switch and the 

load can no longer be hoisted.

Maximum cable length lever 

4

When the load reaches the lowest possible 

position, an end switch is activated, preventing the 

load from being lowered further. This end switch 

also prevents the cable hoist from being operated 

in the wrong direction (hook moving opposite of 
the direction indicated on the push button 

10

).

Install the pulley 

15

 and additional hook 

16

 as 

shown in figures D–G.
Hook the fixed hook 

8

 into the fixing opening 

2

 (see Fig. G). The load will now be lifted 

with two steel cables and the cable hoist can 

therefore lift double the load.

The cable hoist is equipped with a pulley 

15

 and 

an additional hook 

16

 . When used correctly, 

thecable hoist can lift double the load.

Before using

Operation

Mounting (see Fig. C)

Putting the cable hoist

into service

Operating the cable hoist

Setting up the pulley function

(see Fig. D–G)

Summary of Contents for PSZ 250 B2

Page 1: ......

Page 2: ...ATRIX GMBH Postauer Str 26 D 84109 W rth Isar Germany Last Information Update Stanje informacij Stav inform ci Posledn aktualizace informac 04 2015 Ident No PSZ250B2042015 SI SK CZ IAN 114291 CZ SK SI...

Page 3: ...manual DVIGALO Z VLE NO I NO VRVJO Navodila za upravljanje in varnostna opozorila Prevod originalnega navodila za uporabo LANOV NAVIJ K Pokyny pre obsluhu a bezpe nostn pokyny Preklad origin lneho n v...

Page 4: ...oja CZ Slo te p ed ode ten m dv str nky obsahuj c ilustrace a seznamte se se v emi funkcemi p stroje GB Before reading unfold both pages containing illustrations and familiarise yourself with all func...

Page 5: ...A 9 8 9 10 11 12 6 1 1 B C A 7 8 15 16 1 3 4 5 2 1 13 14...

Page 6: ......

Page 7: ......

Page 8: ...D E F G H I 6 15 16 16 15 16 6 6 15 5 7 15 16 9 10 11 8 2 4...

Page 9: ...tices specific to the device Page 7 Before using Mounting Page 8 Setting up the pulley function Page 8 Operation Putting the cable hoist into service Page 8 Operating the cable hoist Page 8 Cleaning m...

Page 10: ...Hoisting drum Shut off weight Emergency stop switch Remote control unit Control lead Deflection pulley Maximum cable length lever Auto stop mechanism lever Steel cable Hook Push button Mains lead Moto...

Page 11: ...g off inching mode Always be attentive whilst operating the cable hoist Never stand or work below the hoisted load Hoisting stuck or jammed loads is prohibited Always pull the mains plug before execut...

Page 12: ...el cable Fig B Remove the adhesive tape from the cable drum 3 prior to first use Ensure the load is properly secured to the hook 8 or for pulley operation the additional hook 16 and always maintain a...

Page 13: ...switch 9 and push buttons 10 are in good condition before every use Check the brake system every 1000 cycles If the motor 14 emits unusual noises or is unable to hoist the rated load the brake system...

Page 14: ...n 3 years from the date of purchase In the event of a warranty claim the customer has the right to have the goods repaired by our own workshop or a workshop authorised by us The device must not be ope...

Page 15: ...B 11 Year of manufacture 2015 W rth Isar 24 04 2015 Joachim Lichtl Managing Director We reserve the right to make technical modifications in the course of product development Declaration of conformity...

Page 16: ...12...

Page 17: ...i za napravo Stran 15 Pred za etkom obratovanja Monta a Stran 16 Nastavitev funkcije krip evja Stran 16 Uporaba Za etek uporabe dvigala Stran 16 Upravljanje ice Stran 16 i enje vzdr evanje in naro ilo...

Page 18: ...za izklop v sili daljinski upravljalnik Krmilni vod Obra alno kolo Ro ka za najdalj o dol ino vrvi Ro ka za samodejni zaustavitveni mehanizem Jeklena vrv Kavelj Tipalo Omre ni kabel Motor Dodatni kav...

Page 19: ...i saj se v nasprotnem primeru lahko po koduje upravljalec Prepre ite hitre vklope in izklope impulzno krmiljenje Med upravljanjem dvigala bodite vedno pozorni Ne stojte ali delajte pod dvignjenim tovo...

Page 20: ...ranite lepilni trak z bobna za vrv 3 Prepri ajte se da bo tovor v skladu s pravili na kavlju 8 oz v primeru uporabe krip evja na dodatnem kavlju 16 in vedno pazite na razdaljo do tovora in jeklene vrv...

Page 21: ...kavelj 8 16 in obra alno kolo 15 v dobrem stanju Pred vsako uporabo dvigala preverite e sta stikalo za izklop v primeru sile 9 in tipalo 10 v brezhibnem stanju Zaviralni sistem preverite na vsakih 100...

Page 22: ...i Magedon Bildst cklstra e 18 AT 9500 Villach T 43 720 11 6465 F 43 720 11 6464 E service matrix direct at Prosimo da za vsa vpra anja pripravite ra un in tevilko izdelka npr IAN 12345 kot dokazilo o...

Page 23: ...etujemo vam da pred tem natan no preberete navodila o sestavi in uporabi izdelka 5 Kupec je dol an poobla enemu servisu predlo iti garancijski list in ra un kot potrdilo in dokazilo o nakupu 6 V prime...

Page 24: ...20...

Page 25: ...k pre pr stroj Strana23 Pred uveden m do prev dzky Mont Strana 24 In tal cia funkcie kladkostroj Strana 24 Obsluha Uvedenie lanov ho zdv hacieho tiahla do prev dzky Strana 24 Ovl danie lanov ho tiahla...

Page 26: ...v s lade s ur en m elom Obsah dod vky Technick daje Popis ast 1 2 4 6 8 10 11 12 13 15 14 16 3 5 7 9 Z vesn rameno Lanov bubon Vyp nacia hmotnos N dzov vyp na ia kov ovl danie Riadiace vedenie Vratn k...

Page 27: ...tla idle 10 Pravidelne kontrolujte lanov zdv hacie tiahlo oh adom po koden Tla idlo 10 mus by v dobrom stave Opravy a dr bov pr ce prenechajte iba elektroodborn kom v autorizovan ch servisn ch pracov...

Page 28: ...stite sa e je n klad n le ite zaisten na h ku 8 pr padne pri prev dzke kladkostroja na pr davnom h ku 16 a neust le dodr iavajte odstup od n kladu a oce ov ho lana 6 Skontrolujte i je n dzov vyp na 9...

Page 29: ...to mo n spust sa p ka pre maxim lnu d ku lana 4 Moto 14 sa teraz mus zastavi Periodicky kontrolujte sie ov k bel 12 a vedenie riadenia 13 Po ka d ch 200 cykloch nama te oce ov lano 6 a vratn kladku 1...

Page 30: ...mi kodami nach dza v obale Tento obal je surovina a preto je op pou ite n alebo m e by op vr ten do kolobehu surov n Pr stroj a jeho pr slu enstvo pozost va z r znych materi lov ako napr kov a plasty...

Page 31: ...mi normat vnymi dokumentami a smernicami ES 2006 42 EC 2006 95 EC 2004 108 EC 2011 65 EU aplikovan harmonizovan normy EN 14492 2 A1 EN 60204 32 EN 55014 1 EN 55014 2 EN 61000 3 2 EN 61000 3 3 Typ ozna...

Page 32: ...28...

Page 33: ...ny specifick pro za zen Strana 31 P ed uveden m do provozu Mont Strana 32 In talace funkce emenice Strana 32 Obsluha Uveden lanov ho t hla do provozu Strana 32 Ovl d n l anov ho t hla Strana 32 i t n...

Page 34: ...d vky Technick Specifikace Popis st 1 2 4 6 8 10 11 12 13 15 14 16 3 5 7 9 Z v sn rameno Zvedac buben Vyp nac hmotnost Sp na nouzov ho zastaven D lkov ovl d n S ov kabel Vodic kladk P ka pro maxim ln...

Page 35: ...eln kon trolujtelanov zvedac t hlo zdanen po kozeno Tla tko 10 us b tv dobr m stavu Opravy a dr bov pr ce p enechejte pouze elektroodborn kem v autorizovan ch U ivatel mus zvednout n klad ze zem s co...

Page 36: ...ed prvn m pou it m Ujist te se e n klad je spr vn upevn n na h ku 8 p padn p i provozu kladkostroje na p davn m h ku 16 a neust le dodr ujte odstup od n kladu a ocelov ho lana 6 Zkontrolujte zda je st...

Page 37: ...mu 5 Motor 14 se mus zastavit Kdy je ocelov lano 6 navinut tak daleko jak je to mo n spust se p ka pro maxim ln d lku lana 4 Moto 14 se nyn mus zastavit Pravideln kontrolujte nap jec kabel 12 a d c ve...

Page 38: ...abalen aby byl chr n n p ed po kozen m p i p eprav Toto balen je surovina a proto znovu pou iteln nebo m e b t recyklov no Tento p stroj a jeho p slu enstv jsou vyrobeny z r zn ch materi l nap kovu a...

Page 39: ...ormami normativn mi dokumenty a sm rnicemi EU 2006 42 EC 2006 95 EC 2004 108 EC 2011 65 EU platn harmonizovan normy EN 14492 2 A1 EN 60204 32 EN 55014 1 EN 55014 2 EN 61000 3 2 EN 61000 3 3 Typ Popis...

Page 40: ...36...

Reviews: