42
Start-up procedures
8 Start-up
Instruction book, IQAN-MC3
8
Start-up
Start-up procedures
This chapter contains instructions for action to be taken in connection with the initial
start, for example, setting values, calibrating and testing the system.
W
ARNING
Risk of injury!
If the control system is not fitted properly, the machine could move uncontrollably. The
machine’s engine shall not be started before the control system is completely fitted and
its signals are verified.
Starting the control system
Start the control system as follows:
•
Prior to start, all modules and cables are to be fitted correctly.
•
Check fuses, i.e. make sure that the supply voltage to the modules is equipped with
the correct fuse.
•
Make sure that connections for supply voltage and return lines are correct in the
cable’s conductor joint.
•
Make sure that the ID-tag is connected properly if used.
•
Make sure the emergency stop works.
The emergency stop should disconnect the supply voltage to all modules.
Emergency stop.
Alternatively, the emergency stop may also shut off the diesel engine or a dump valve,
and with that depressurize the hydraulic system.
+BAT
Dump valve
Emergency stop
IQAN-MC3
+BAT
Summary of Contents for iqan-mc3
Page 1: ...IQAN MC3 Instruction book Publ no HY33 8001 IB UK Edition 2016 05 16...
Page 18: ...15 Markings Approvals 4 Safety Instruction book IQAN MC3 Markings Approvals...
Page 19: ...16 Markings Approvals 4 Safety Instruction book IQAN MC3...
Page 20: ...17 Markings Approvals 4 Safety Instruction book IQAN MC3...
Page 21: ...18 Markings Approvals 4 Safety Instruction book IQAN MC3...
Page 22: ...19 Markings Approvals 4 Safety Instruction book IQAN MC3...