Monthly maintenance
Inspect intake opening for regeneration gas
The regeneration gas is fed to the system through an intake opening at the
heater.
►
Wait until the dryer has reached the stand-by phase (see page 21).
►
Work with care and do not touch hot surfaces:
—
After the vacuum pump has stopped, inspect screws at the intake
opening and retighten, if necessary.
—
Remove dirt from the screen covering the opening, using a suitable tool
(e.g. soft wire brush).
Note:
It is feasible to install an intake filter or to supply the regeneration air
to the dryer via an air duct if the ambient air is heavily soiled. Please
note the respective hints in sections
Options
.
Six-monthly maintenance work
Check the screw and clamp connections
After six months at the latest, all the switch cabinet's screw and clamp
connections must be checked to ensure that they are secure. The maintenance
interval should be reduced in the case of a vibrating substrate or a vibrating
compressor feed line.
►
De-pressurize the dryer and shut it down (see page 42).
►
Switch off the electric power feed, and take precautions to prevent it being
switched back on.
►
Check that all the screw connections and clamps in the switch cabinet are
secure, and tighten if necessary.
►
Replace any corroded components immediately.
►
Switch the electric power supply back on and close the switch cabinet.
►
Restart the dryer.