6.10
Preparing a battery
This procedure must be carried out in workshop.
6.10.1
Preliminary operations
Non applicable
6.10.2
Procedure
A.
To connect the 2 terminals, stack as follows (from the outside of the battery):
screw,
battery terminal,
serrated washer,
strand terminal,
nut with serrated base.
Preparing the connections
B.
Put caps on the two terminals.
C.
Put a tie to waterproof the connection (as indicated on the figure below).
Waterproofing the connections (example with + red terminal)
D.
Put a third tie at the base of the red terminal protection of the 42 Ah battery (as indicated on the figure
below).
Last tie
E.
Cut the ties and slightly curve the terminals toward the inside of the battery.