background image

13

OPTION TWO

• (2) 2”X12” PVC PIPE (port 3,6)
• (2) 2”X15” PVC PIPE (port 2,4)
• (2) 2”X18” PVC PIPE (port 1,5)
• (1) 2”X21” PVC PIPE (port inlet)
• (2) 2”X2 1/4” PVC PIPE (port 6)
• (8) 2” SLIP 90° elbows
•  Optional: replace (2) 90° elbows and (2) 2”x2 ¼” 

pipes with (2) spigot 90° elbows (port 6)

• Set in trench 19” deep X 12” wide

IMPORTANT: PORT 1 AND 5 MUST BE SET AT 15° OFF 
CENTERLINE IN ORDER TO CLEAR 

VALVE CIRCUIT LAYOUT

6 CIRCUIT 004-302-4184-03

Summary of Contents for ECOSYSTEM

Page 1: ...4 027 8775 00 REV00 ECN_1752 PUB 042319 295 East Corporate Place Suite 100 Chandler AZ 85225 Toll Free 1 800 621 5886 Phone 480 893 7607 Fax 480 753 3397 Paramount 1Paramount com www 1Paramount com US...

Page 2: ...ramount com IMPORTANT NOTICE FORWARD PLEASE REVIEW THE OWNER S MANUAL AND INSTALLATION GUIDE IN ITS ENTIRETY AND HEED ALL SAFETY INFORMATION Failure to follow these instructions and warnings can resul...

Page 3: ...LUMBING DETAIL 10 PLUMBING FLOOR 10 2 NOZZLES ON A LINE 11 3 NOZZLES 11 4 NOZZLES 11 PLUMBING WATER VALVE 12 GLUING INSTRUCTIONS 12 2 VALVE BASE PLUMBING GUIDE 12 VALVE CIRCUIT LAYOUT 13 PLUMBING HEAT...

Page 4: ...TEM START UP 24 CLEANING NOZZLE INSTALLATION 24 ECO NOZZLE WITH TWIST LOCK CAP 24 INSTALLING NOZZLE IN FLOOR 24 WINTERIZING INSTRUCTIONS 25 WINTERIZATION PROCEDURE FOR IN FLOOR SYSTEM 25 WINTERIZATION...

Page 5: ...oper chemical balance Brush the pool periodically Clean baskets and filters on a regular basis In conclusion the IN FLOOR SYSTEM is not a 100 cleaner and should never be presented as such SURFACE RETU...

Page 6: ...ob Name City State Address Contact Name City Zip Sales Person Revisions Telephone Previous Drawing E mail pdf dwg What Is Revised Fax Reply by fax Check Corresponding Boxes And Fill In The Blanks To B...

Page 7: ...ocation break location overall dimension the nozzle placement must also change A revised plan must be drawn Choose one nozzle to use as a starting point and indicate dimensions to outer walls This wil...

Page 8: ...the in floor system Additional equipment such as chlorine generators spa overflows water features etc require more water flow Adjust pump GPM requirements accordingly FILTER REQUIREMENTS SELECTING PRO...

Page 9: ...VENTURI SKIMMER GPM SKIMMER MDX R3 DEBRIS DRAIN SDX MIN FILTER CART 130 D E 48 SAND 49 HEATER CIRCULATION SYSTEM PUMP_____ GPM_____HD OPTIONAL EDC CANISTER OPTIONAL DDC CANISTER PUMP CHLOR RETURN SPA...

Page 10: ...finished pool floor except for steps and benches Step and bench nozzles should be on a separate port The number of nozzles per port in the floor should be constant whenever possible All pipes should...

Page 11: ...not plumb nozzles in line all nozzles must be on a branch 3 NOZZLES 4 NOZZLES 2 NOZZLES ON A LINE INCORRECT METHOD OF PLUMBING NOTICE Nozzles will not rotate dependably if plumbing directive is not fo...

Page 12: ...t in trench 15 deep X 19 wide NOTICE Height of riser pipes may be adjusted as long as the 3 height differential between fittings is maintained GLUING INSTRUCTIONS 1 Remove Clamp 2 Lift off dome save 0...

Page 13: ...1 PVC PIPE port inlet 2 2 X2 1 4 PVC PIPE port 6 8 2 SLIP 90 elbows Optional replace 2 90 elbows and 2 2 x2 pipes with 2 spigot 90 elbows port 6 Set in trench 19 deep X 12 wide IMPORTANT PORT 1 AND 5...

Page 14: ...created when all the water is directed through the heater THE IN FLOOR SYSTEM MAY NOT FUNCTION PROPERLY WITHOUT THIS BY PASS NOTE MULTI SPEED PUMPS AND HEATERS HEAT PUMP When plumbed with a bypass the...

Page 15: ...System EQUIPMENT SIDE DEBRIS CANISTER PLUMBING 8 Minimum Straight Pipe Apply primer twice before gluing pipe or fittings to EDC canister Pump Install 3 Way Valve Ahead of the LeafVac ONLY Suction From...

Page 16: ...ER MDX R3 SDX2 9 229mm 3 90mm MAIN DRAIN DECKS OVER 4 102mm THICK MAY REQUIRE A LID EXTENSION PLUG CONNECTION 1 50mm EQUALIZER LINE THROUGH POOL WALL TO PUMP 2 75mm LINE TO SECONDARY WALL SUCTION MDX...

Page 17: ...LUMBING FOR SPA Consult the Paramount MDX R3 VGB Compliant Debris Drain for specific instruction on how to plumb DOWNLOAD INSTRUCTION MANUALS MDX R3 Non Adjustable Concrete www 1paramount com manuals...

Page 18: ...RE 2 ELBOW PLUMBING FOR SMOOTH BODY PLUMBING NOZZLE BODIES NOTICE All risers must be 90 degrees perpendicular to the finished floor NOTICE All risers must be 90 degrees perpendicular to the finished f...

Page 19: ...n more than 4 radius on steps or benches 2 Nozzles should be pulled out as far as possible in order to reach corners 3 Reversed radius of step corners will help to eliminate dirty steps This will also...

Page 20: ...nd create a water stop Verify the angle of the risers as it is imperative that the riser angle be 90 degrees from the finished floor angle Check that the system did not lose pressure prior to shooting...

Page 21: ...e a cutout or opening approximately 1 deep and 1 bigger than the pipe This cutout will be filled with plaster to create a water stop Remove cap Prime the inside of the pipe NOTICE DO NOT PRIME THE BOD...

Page 22: ...deep and 1 bigger than the pipe This cutout will be filled with plaster or other finish coat to create a water stop Remove cap Prime the inside of the pipe NOTICE DO NOT PRIME THE BODY SMOOTH BODY INS...

Page 23: ...alternate blocking off all but one nozzle on that circuit one at a time to clean out any debris Use of the pause control will hold the valve on that port while doing this The equipment needs to run fo...

Page 24: ...ize from pool plan and using the nozzle tool to twist on caps 4 Turn cap clockwise until it snaps into place Be sure o ring is pushed all the way up to top flange 1 Snap the nozzle onto the install to...

Page 25: ...ce normal winterization procedures but are instead in addition to them For drain winterization instructions consult manufacturer s instructions for that drain WINTERIZATION PROCEDURE FOR DECK SIDE DEB...

Page 26: ...ir lock when blowing out the bottom drain in the pool Blow out center port of first valve back to filter equipment and plug 6 While blowing out the down jets or any nozzle bodies above freeze zone and...

Page 27: ...p is off something is stuck in it Try the following items one at a time until the problem is solved Push the Nozzle down with a pool pole Remove the Nozzle rinse to remove all debris Replace if damage...

Page 28: ...Turbine turn the Gears If not replace Module All nozzles are floating when the pump is on When all Nozzles are floating or have water running through them all at the same time check the Module Module...

Page 29: ...ieces 1 4 7 16 1 Each 3 004 527 4120 XX ECO Ribbed Body with Plaster Cap 4 004 527 4762 XX ECO Smooth Body with Plaster Cap Requires the use of a riser 005 252 1520 00 or 005 252 1522 00 5 004 552 545...

Page 30: ...and Clamp Knob 005 302 0640 00 Band Clamp Nut 005 302 0100 00 Base O Ring Valve Base US 005 302 4002 03 2 Port Base 2 Black 005 302 4012 03 3 Port Base 2 Black 005 302 4018 03 4 Port Base 2 Black 005...

Reviews: