HALFEN HIT Insulated Balcony Connection

 

HIT-US 05/12 

Page 1/2 

 

 

 

 

Type HIT-BX 

 

 

 

 

 

 

 

 

 
 

 

 

Install bottom reinforcement of the floor and the balcony 

slab. 

 

Install top reinforcement of the floor slab and any 

additional edge reinforcement

.

 

 

Add longitudinal tension reinforcement on both sides at 

the bottom of the insulation joint with end anchoring 
stirrups 

.

 

 

Place and align the HIT unit and attach it to the top 
reinforcement of the floor slab by wire ties. Place and 
align the HIT unit and attach it to the top reinforcement 
of the floor slab by wire ties. Check that the red arrow on 
the top of the unit is pointing towards the balcony (see 
illustration below). The top reinforcing bars of the floor 
slab (running transverse to the slab edge) are at the 
same level as the top HIT unit bars. The perpendicular 
bars parallel to the slab edge are positioned below the 
top level of reinforcement. 

 

Add longitudinal top reinforcement to both sides of the 
insulation joint. 

 

Install the upper reinforcement of the balcony slab and 

secure it to the top bars of the HIT unit by wire ties. 

When pouring the concrete to form the floor and balcony 
slabs check that it is poured and compacted equally to 
prevent displacement of the HIT units. Also double-check 
the level of the balcony slab! 

 

Type HIT-BQ 

 

 

 

 

 

 

 

 

 

 

Install bottom and 

 

top slab reinforcement. 

 

Place and align the HIT element and use wire ties to 

attach it to the top floor slab reinforcement. Check that 
the red arrow on the top of the unit is pointing towards 
the balcony (see illustration below). 

 

At each HIT shear bar add a stirrup on both sides of the 

insulation joint. 

 

Install reinforcing bars below and above, and end 

stirrups 

 

on both the balcony and the floor slab side. 

 

Place the bottom and top reinforcement 

 

of the 

balcony, including the edge reinforcement. 

When pouring the concrete to form the floor and balcony 
slabs check that it is poured and compacted equally to 
prevent displacement of the HIT units. Also double-check 
the level of the balcony slab!

 

 

 

 

 
 
 
 

© 2012 HALFEN ∙ Inst-HIT-US 05/2012 ∙ www.halfenusa.com 

Extract from product label 
indicating position of HIT 
unit relative to balcony 

 

Extract from product label 
indicating position of HIT 
unit relative to balcony 

 

HIT-BX 

floor slab 

balcony 

bearing 

floor slab 

balcony 

bearing 

HIT-BQ 