![background image](http://html2.mh-extra.com/html/paramount-fitness/clear-03/clear-03_installation-manual_3650963015.webp)
5.
Install the 3/8” OD x ¼ ID tubing on
the barbed end of the venturi, with
the check valve installed in-line. Note
the correct direction of flow through
the check valve.
(Fig. 19A & 19B)
6.
Connect the tubing to the
compression fitting.
(Fig. 20)
7.
Connect the compression fitting to
the flow meter.
(Fig 21)
OPTIONAL SUBMERGED EQUIP. INSTALL.(CONT.)
15
For technical assistance call 1.800.621.5886 or contact your regional representative
Fig. 19
Fig. 20
Fig. 21
Fig. 19B