A. Configuration Options
8774-A2-GB20-40
February 2001
A-9
Table A-4.
System Options
DSL Mode
Possible Settings: LTU, NTU
Default Setting: LTU
Controls whether the unit is configured as a control unit or tributary unit.
LTU – The unit is configured as a control unit (Line Termination Unit).
NTU – The unit is configured as a tributary unit (Network Termination Unit). This unit will
request its IP address from the LTU during establishment of the PPP link.
NOTE: Changing this option will reset the card.
Test Timeout
Possible Settings: Enable, Disable
Default Setting: Enable
Allows tests to end automatically. The feature should be enabled when the unit is remotely
managed, so that control can be regained after a test is accidentally executed.
Enable – Loopback and pattern tests end when test duration is reached.
Disable – Tests run until manually terminated from the Network Tests screen or remotely
(network initiated tests). Refer to
Running Network Tests
in Chapter 5,
Testing.
Test Duration (min)
Possible Settings: 1 – 120
Default Setting: 10
Number of minutes for a test to be active before automatically ending.
Test Duration (min) option appears when Test Timeout is enabled.
1 – 120 – Amount of time in minutes for a test to run before terminating.
Telco Initiated Loopback
Possible Settings: Enable, Disable
Default Setting: Enable
Determines if the unit will respond to Telco loopback commands on the DSX-1 interface.
See
Telco-Initiated Tests
in Chapter 5,
Testing.
Enable – The unit will respond to Telco loopback commands.
Disable – The unit will not respond to Telco loopback commands.
Remote Telco Line Loopback
Possible Settings: Enable, Disable
Default Setting: Disable
Determines if the unit will perform a Telco-initiated loopback on just the local unit or if the
loopback will be performed on the remote DSL unit. See
Telco-Initiated Tests
in Chapter 5,
Testing.
Enable – The loopback will be in the remote unit.
Disable – The loopback will be in the local unit.
Summary of Contents for Hotwire 8774
Page 24: ...2 Using the Asynchronous Terminal Interface 2 10 February 2001 8774 A2 GB20 40 ...
Page 62: ...5 Testing 5 12 February 2001 8774 A2 GB20 40 ...
Page 68: ...6 Messages and Troubleshooting 6 6 February 2001 8774 A2 GB20 40 ...
Page 100: ...D Technical Specifications D 2 February 2001 8774 A2 GB20 40 ...